Wastewater Projects Under Construction


  • Colewood Street Sanitary Sewer Extension and Improvement

    • Project No. WW-000006-003
    • Project Engineer –Natasha Schmidt
    • Scope –Construction of 115 linear feet of 8-inch diameter Polyvinyl Chloride (PVC) gravity sewer, concrete manhole, 875 linear feet of 1.25-inch to 2-inch diameter force main, and six grinder pumps.
    • Anticipated Completion – June 2013 
    • Contractor – Sagres Construction
       
  • Rehabilitation of the Primary Sludge Degritting Facilities & Replacement of MCC-2 at Noman Cole

    • Project No. WW-000017-007 
    • Project Engineer –Mohamed Madih 
    • Scope – Construction of the rehabilitation of the primary sludge degritting facilities and replacement of MCC-2 at Noman M. Cole Jr., Pollution Control Plant, 9399 Richmond Highway, Lorton, Virginia 22079.  The rehabilitation of the primary sludge degritting facilities and replacement of MCC-2 project consists of, but is not limited to; replace grit removal and screening equipment, HVAC equipment, electrical equipment, instrumentation/control equipment, pumps, and valves; improve building conditions (door/window replacement, floor drainage, lighting, flushing water); install health and safety equipment; improve vehicular access to grit dumpsters and the loading dock; and remove abandoned sodium hypochlorite tank, pumps and piping from lower level of H1 Building.
    • Anticipated Completion – July 2014
    • Contractor – Ulliman Schutte Construction

  • Tertiary Clarifier Rehabilitation

    • Project N0. X00911
    • Project Engineer – Chris Triolo
    • Scope – The Tertiary Clarifier Rehabilitation project consists of, but is not limited to, concrete restoration of existing structures, replacement of mechanical and electrical equipment, installation of new motor control centers, installation of a new ferric chloride feed system, installation of new clarifier equipment and all other associated work and appurtenances, complete, in place, and in accordance with the project bid documents.
    • Anticipated Completion – Fall 2013
    • Contractor – American Contracting and Environmental Services, Inc.
  • ENR-1, Moving Bed Biofilm Reactors

    • Project N0. N00323
    • Project Engineer – Matt Doyle
    • Scope - The Moving Bed Biofilm Reactors (MBBR) project consists of, but is not limited to, existing screen building (B1) improvements, new MBBR facility, new blower building, new methanol building, existing ASE pump station improvements, and other associated work and appurtenances complete, in place and in accordance with the Contract Documents.
    • Anticipated Completion – Spring 2013
    • Contractor – Ulliman Schutte Construction, LLC
  • Upgrades to the Standby Generators

    • Project N0. X00911
    • Project Engineer – Matt Doyle
    • Scope – The Upgrades to the Standby Generators project consists of, but is not limited to, demolition of an existing sludge thickening facility and three existing 2,000 kW generators and the installation of five new 2,000 kW generators, switch gear/controls and necessary associated electrical work. The project scope also includes extensive upgrades to the plant's existing switchgear, installation of new switchgear and manual transfer switches and installation of a plant-wide fiber optic cable communication system. Extensive coordination between the Contractor and Dominion Virginia Power is required throughout the course of the project.
    • Anticipated Completion – Fall 2013
    • Contractor – Ulliman Schutte Construction, LLC
  • Dogue Creek Force Main Replacement

    • Project No. 402/L00117
    • Project Engineer – Brendan Schillo
    • Scope – Replacement of approximately 4,400 linear feet of 36-inch ductile iron sewer force main utilizing micro-tunneling technology.
    • Anticipated Completion – Spring 2013
    • Contractor – Michels Corporation
  • Emergency Replacement of 36-inch Sanitary Sewer Crossing at Lower Holmes Run

    • Project No. X00903(40003)
    • Project Engineer – Brendan Schillo
    • Scope – Replace a 36-inch section of pipe crossing Holmes Run that failed due to floodwaters from September 2011 Tropical Storm Lee. The project is split into two phases. Phase 1 establishes a permanent bypass from the Fairfax County Manhole to an Alexandria Sanitation Authority Manhole.  Phase 2 will replace the 36” pipe stream crossing.
    • Anticipated Completion – Spring 2013
    • Contractor – Phase 1: Tessa Construction and Tech Company; Phase 2: To be determined
  • Fairfax Acres Subdivision Sanitary Sewer Extension and Improvement

    • Project No. X00828 (10001)
    • Project Engineer –  Frank Roberts
    • Scope – Construction of approximately 6,450 linear feet of 8-inch diameter sanitary sewer pipe, 39 precast concrete manholes, 72 gravity lateral spurs, various erosion control devices, extensive restoration to include 3,750 square yards of seeding, 2,400 square yards of sodding, 14,090 square yards of asphalt overlay, and other related items. Be advised that a portion of this project is located within an area that may contain naturally occurring asbestos soils.
    • Anticipated Completion – Spring 2013
    • Contractor – William B. Hopke Co Inc.
  • I-95 Sanitary Landfill ATLL Unit, Phase III-B Liner

    • Project No. 186435
    • Project Engineer – Terrence Steele
    • Scope – Construction of the ATLL Unit Phase IIIB Liner, and MSW Unit Cap and Drainage Improvements covering approximately 25.0 acres.  The project includes, in general, the installation of approximately 11.0 acres of multi-layer soil and geosynthetic liner system, miscellaneous site grading, leachate collection system, landfill gas system, improvements to stormwater systems at SB-23 and SB-26, perimeter berms, seeding of disturbed areas, and road improvements on the project site. The project also includes construction of several concrete structures and extensive work inside a confined space, where landfill gas is present.
    • Anticipated Completion – Winter 2013
    • Contractor – Sargent Corporation

Contact Fairfax County: Phone, Email or Twitter | Main Address: 12000 Government Center Parkway, Fairfax, VA 22035
Technical Questions: Web Administrator

ADA Accessibility | Website Accessibility
Awards | FOIA | Mobile | Using this Site | Web Disclaimer & Privacy Policy | Get Adobe Reader
Official site of the County of Fairfax, Virginia, © Copyright 2013

Website Survey Website Survey    Globe with various flags representing Web site language translations   Language Translations

Return to Graphic Version