Wastewater Projects Under Construction
-
Old Courthouse Road at Besley Road Sanitary Sewer Extension and
Improvement
-
Project no. X00828 (10004)
-
Project Engineer-Terrence Steele
-
Scope-Installation of 840 linear feet of 8-inch diameter
sanitary sewer pipe, eight pre-cast concrete manholes, six lateral
spurs, 92 linear feet of jack and bore to include 21-inch diameter
steel casing, one stream crossing, various erosion control devices,
clearing, seeding, sodding and extensive restoration to include
1,620 square yards of asphalt overlay, and other related items.
-
Anticipated Completion- Spring 2012
-
Contractor- Sagres Construction Corporation
-
Tertiary Clarifier Rehabilitation
-
Project N0. X00911
-
Project Engineer – Chris Triolo
-
Scope – The Tertiary Clarifier Rehabilitation project consists of,
but is not limited to, concrete restoration of existing structures,
replacement of mechanical and electrical equipment, installation of
new motor control centers, installation of a new ferric chloride
feed system, installation of new clarifier equipment and all other
associated work and appurtenances, complete, in place, and in
accordance with the project bid documents.
-
Anticipated Completion – Winter 2013
-
Contractor – American Contracting and Environmental Services, Inc.
-
-
ENR-3, Water Reuse Project at Noman Cole Pollution Control Plant
-
Project N0. 408/N00323
-
Project Engineer – Mike Knizner
-
Scope – Design and construction of 4.6-mile reuse water pipe line,
pump station improvements, elevated water storage tank, irrigation
system and booster pumps.
-
Anticipated Completion – Fall 2011
-
Contractor – M. A. Bongiovanni, Inc.
-
-
Rehabilitation of the Dogue Creek SPS
-
Project N0. 402/L00117
-
Project Engineer – Terrence Steele
-
Scope – Major rehabilitation and new construction in an exisiting
40 MGD SPS.
-
Anticipated Completion – Summer 2011
-
Contractor – American Contracting and Environmental Services,
Inc.
-
-
ENR-1, Moving Bed Biofilm Reactors
-
Project N0. N00323
-
Project Engineer – Matt Doyle
-
Scope - The Moving Bed Biofilm Reactors (MBBR) project consists of,
but is not limited to, existing screen building (B1) improvements,
new MBBR facility, new blower building, new methanol building,
existing ASE pump station improvements, and other associated work
and appurtenances complete, in place and in accordance with the
Contract Documents.
-
Anticipated Completion – Fall 2012
-
Contractor – Ulliman Schutte Construction, LLC
-
-
Upgrades to the Standby Generators
-
Project N0. X00911
-
Project Engineer – Matt Doyle
-
Scope – The Upgrades to the Standby Generators project consists of,
but is not limited to, demolition of an existing sludge thickening
facility and three existing 2,000 kW generators and the
installation of five new 2,000 kW generators, switch gear/controls
and necessary associated electrical work. The project scope also
includes extensive upgrades to the plant's existing switchgear,
installation of new switchgear and manual transfer switches and
installation of a plant-wide fiber optic cable communication
system. Extensive coordination between the Contractor and Dominion
Virginia Power is required throughout the course of the project.
-
Anticipated Completion – Fall 2013
-
Contractor – Ulliman Schutte Construction, LLC
-
Salona Village Sanitary Sewer Extension and Improvement
-
Project No.: X00828 (10010)
-
Project Engineer: Mike Knizner
-
Scope: Construction of 3,600 lnear feet of 8-inch diameter
gravity sewer pipe, 25 precast concrete manholes, 24 gravity
lateral spurs, 50 linear feet of 20-inch diameter casing pipe, 2
grinder pumps, 350 linear feet of 1.25-inch diameter force
main sewer pipe, extensive restoration to include seeding, sodding
and 12,500 square yards of asphalt overlay.
-
Anticipated Completion: Fall 2012
-
Contractor: Omni Construction, Inc.
-
Dogue Creek Force Main Replacement
-
Project No. 402/L00117
-
Project Engineer – Brendan Schillo
-
Scope – Replacement of approximately 4,400 linear feet of 36-inch
ductile iron sewer force main utilizing micro-tunneling technology.
-
Anticipated Completion – Winter 2012
-
Contractor – Michels Corporation
-
Emergency Replacement of 36-inch Sanitary Sewer Crossing at Lower
Holmes Run
-
Project No. X00903(40003)
-
Project Engineer – Brendan Schillo
-
Scope – Replace a 36-inch section of pipe crossing Holmes Run that
failed due to floodwaters from September 2011 Tropical Storm Lee.
The project is split into two phases. Phase 1 establishes a
permanent bypass from the Fairfax County Manhole to an Alexandria
Sanitation Authority Manhole. Phase 2 will replace the 36”
pipe stream crossing.
-
Anticipated Completion – Summer 2012
-
Contractor – Phase 1: Tessa Construction and Tech Company; Phase 2:
To be determined
-
I-66 Sanitary Sewer Crossing Replacement
-
Project No.X00903 (20003)
-
Project Engineer – Terrence Steele
-
Scope – Construction of approximately 330 linear feet of
18-inch diameter sanitary sewer pipe in a 36-inch diameter
casing using micro-tunneling methods, furnish and install 5 precast
concrete manholes, installation of two (2) thirty-foot wells,
maintenance of flows in existing sewers, maintenance of traffic,
restoration of site, and other related items.
-
Anticipated Completion – Fall 2012
-
Contractor – Bradshaw Construction Corporation
-
Turkey Run Road Sanitary Sewer E&I
-
Project No. X00828 (10008)
-
Project Engineer – Andy Royse
-
Scope – Construction of 3,100 linear feet of 1.5-inch to
2.5-inch diameter force main, 23 force main service
connections, 7 grinder pumps, various erosion control devices, and
extensive restoration to include 3,000 square yards of sod and
7,200 square yards of asphalt overlay.
-
Anticipated Completion – Fall 2012
-
Contractor – Arthur Construction Company, Inc.
-
Fairfax Acres Subdivision Sanitary Sewer E&I
-
Project No. X00828 (10001)
-
Project Engineer – Frank Roberts
-
Scope – Construction of approximately 6,450 linear feet of
8-inch diameter sanitary sewer pipe, 39 precast concrete manholes,
72 gravity lateral spurs, various erosion control devices,
extensive restoration to include 3,750 square yards of seeding,
2,400 square yards of sodding, 14,090 square yards of asphalt
overlay, and other related items. Be advised that a portion
of this project is located within an area that may contain
naturally occurring asbestos soils.
-
Anticipated Completion – Spring 2013
-
Contractor – William B. Hopke Co Inc.
-
Portland Place Phase I
-
Project No. X00828 (10005)
-
Project Engineer – Mike Gallo
-
Scope – Construction of approximately 1,160 linear feet of
8-inch diameter sanitary sewer pipe, 6 precast concrete manholes, 9
lateral spurs (4-inch diameter), 925 linear feet of 1.25-inch
diameter and 355 linear feet of 2-inch diameter sanitary sewer
force main pipe, 6 grinder pumps, 1 grinder pump stub out,
extensive restoration to include 4,100 square yards of asphalt
overlay, 2,400 square yardsY of sodding and other related items.
-
Anticipated Completion – Fall 2012
-
Contractor – Utilities Unlimited, LLC
-
I-95 Sanitary Landfill ATLL Unit, Phase III-B Liner
-
Project No. 186435
-
Project Engineer – Terrence Steele
-
Scope – Construction of the ATLL Unit Phase IIIB Liner, and MSW
Unit Cap and Drainage Improvements covering approximately 25.0
acres. The project includes, in general, the installation of
approximately 11.0 acres of multi-layer soil and geosynthetic liner
system, miscellaneous site grading, leachate collection system,
landfill gas system, improvements to stormwater systems at SB-23
and SB-26, perimeter berms, seeding of disturbed areas, and road
improvements on the project site. The project also includes
construction of several concrete structures and extensive work
inside a confined space, where landfill gas is present.
-
Anticipated Completion – Fall 2012
-
Contractor – Sargent Corporation