Mason District BRAC 133 Task Force
October 4, 2011 Supplemental Materials
Washington Metropolitan Area Transit Authority (WMATA) Bus Route
Timetables
Bus route timetables that serve the Mark Center/Southern
Towers/Skyline/Lincolnia areas include:
- (7 A, E, F, Y) Lincolnia-North Fairlington Line http://www.wmata.com/bus/timetables/VA/7a-y.pdf
- (7 B, C, D, H, P, W, X) Lincolnia-Park Center-Pentagon Line http://www.wmata.com/bus/timetables/VA/7b-x.pdf
- (7 M) Mark Center-Pentagon Line http://www.wmata.com/bus/timetables/VA/07m.pdf
- (25 A, C, D) Ballston-Bradlee-Pentagon http://www.wmata.com/bus/timetables/va/25a-g.pdf
- (25 B) Landmark-Ballston http://www.wmata.com/bus/timetables/va/25a-g.pdf
- (28 F, G) Skyline City http://www.wmata.com/bus/timetables/va/28fg.pdf
- (29 C, E, G, H, X) Annandale Line http://www.wmata.com/bus/timetables/va/29c-x.pdf
- (29 K, N) Alexandria-Fairfax Line http://www.wmata.com/bus/timetables/va/29kn.pdf
Additional PDFs of WMATA bus timetables are available at http://www.wmata.com/bus/timetables/timetables-state.cfm?State=VA
Fairfax County Bus Stop Guidelines, Fairfax County Bus Stop Inventory and Safety Study, July 2004
Bus Stop Design Guide (short version), WMATA, December 2009 (selected excerpts)
Guidelines for the Design and Placement of Transit Stops, WMATA,
December 2009.
http://www.wmata.com/pdfs/planning/Bus_Stop_Guidelines_Brochure.pdf
Guidelines: Design and Placement of Transit Stops - Final Report,
WMATA, December 2009.
http://www.wmata.com/pdfs/planning/WMATA%20Guidelines-Design%20and%20Placement%20of%20Transit%20Stops.pdf
Project Information Sheet: Auxiliary Lanes (Duke St.- Seminary
Road)
VDOT
project to widen approximately 4200 feet of I-395 in the northbound
direction between Duke Street and Seminary Road Interchanges.
Virginia Megaprojects I-95 HOV/HOT Lanes Web page, Virginia
Department of Transportation & Department of Rail and Public
Transportation
http://www.vamegaprojects.com/about-megaprojects/i-95-hov-hot-lanes/#overview
Virginia Megaprojects I-95 HOV/HOT Lanes, Appendix A - Conceptual
Design Plan - I-95 HOT Lanes Project Conceptual Design Plans,
September 2011
http://www.vamegaprojects.com/tasks/sites/default/assets/File/pdf/95HOVHOT/110909_AppdxA_ConceptualDesignPlans_I-95HOTEA.pdf
"Mark Center (BRAC-133) Spot Improvement Priority Ranking", FCDOT, October 4, 2011
Governor’s Mark Center Task Force – Achievements List


Website Survey