Land Development Services

Fairfax County, Virginia

CONTACT INFORMATION: Office hours: 8 a.m.-4:30 p.m. Counter hours: 8 a.m. – 4 p.m. (M-Th), 9:15 a.m.-4 p.m. (F)

703-324-1780
TTY 711

12055 Government Center Pkwy
Fairfax, VA 22035

Bill Hicks,
Director

Plan Distribution

Site and Subdivision Plans

Is this the 1st submission or 2nd submission?
Minimum number of Sets Required:
DPE Plan?

Standard Distribution Points

Site Review (SDID and ESRD)
Addressing
Wastewater (WPMD)
Fire Marshall
Water Authority (FCWA)
VDOT
Streetlights
Board of Supervisors
Urban Forestry
Stormwater Management
Bonds and Agreements

Project Specific Distribution Points

Park Authority: Abuts or adjacent to park land, All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Northern Virginia Soil and Water Conservation District (NVSWCD): All County projects, Projects in Pohick Creek Watershed or 3 miles of the Potomac River.
Health Department: Only for Projects that use Septic Systems, Wells and/or Community Pools
Housing and Development (DHCD): Proposing ADUs or WFUs
Proffer Review: Related to a Zoning Application
Department of Transportation (FDOT): All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Office of Community Revitalization (OCR): All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Providence District Supervisor: Project is located within 49-1, 49-2, 49-3, 49-4 or 59-2
Commercial Revitalization District (CRD): All located in within 17-2, 30-2, 30-4, 49-1 through 49-4, 51-1, 51-3, 51-4, 60-3, 61-2, 61-4, 62-1, 62-3, 71-1, 71-2, 80-3, 80-4, 83-1 through 83-4, 90-2, 90-4, 92-2, 92-4, 93-1, 93-3, 101-2, 101-3, 101-4, 102-1, 109-2, 110-1
Total number of plans needed:    

*If Certificate of No Change is provided with the signed approved coversheet, distirbution to that outside agency will not occur unless Site Review determines it necessary - FM is the only exeption to this rule.

Public Improvement Plans

Is this the 1st submission or 2nd submission?
Minimum number of Sets Required:

Standard Distribution Points

Site Review (SDID)
Wastewater (WPMD)
Fire Marshall
Water Authority (FCWA)
VDOT
Streetlights
Board of Supervisors
Urban Forestry
Bonds and Agreements

Project Specific Distribution Points

Park Authority: Abuts or adjacent to park land, All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Northern Virginia Soil and Water Conservation District (NVSWCD): All County projects, Projects in Pohick Creek Watershed or 3 miles of the Potomac
Health Department: Wells and/or Septic
Proffer Review: Related to a Zoning Application
Department of Transportation (FDOT): All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Office of Community Revitalization (OCR): All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Commercial Revitalization District (CRD): All located in within 17-2, 30-2, 30-4, 49-1 through 49-4, 51-1, 51-3, 51-4, 60-3, 61-2, 61-4, 62-1, 62-3, 71-1, 71-2, 80-3, 80-4, 83-1 through 83-4, 90-2, 90-4, 92-2, 92-4, 93-1, 93-3, 101-2, 101-3, 101-4, 102-1, 109-2, 110-1
Total number of plans needed:    

*If Certificate of No Change is provided with the signed approved coversheet, distirbution to that outside agency will not occur unless Site Review determines it necessary - FM is the only exeption to this rule.

INF, Conservation Plans, Rough Grading Plans

What type of plan is this?
Plan is related to major?

Standard Distribution Points

Site Review (SDID and ESRD)
Bonds and Agreements

Project Specific Distribution Points

Park Authority: Abuts or adjacent to park land, All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Health Department: Only for Projects that use Septic Systems, Wells and/or Community Pools
Addressing: If the subject lot is vacant, corner lot or relocation of driveway (from one street to another)
Proffer Review: Related to a Zoning Application
Department of Transportation (FDOT): All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Office of Community Revitalization (OCR): All located in within 16-3, 16-4, 17-1, 17-2, 17-3, 17-4, 18-3, 26-1, 26-2 or 27-1, 29-1 through 29-4, 30-3, 39-2
Providence District Supervisor: Project is located within 49-1, 49-2, 49-3, 49-4 or 59-2
Urban Forestry: Project is in Providence, Drainsville, or Mount Vernon District OR Tree Preservation Box is checked "Yes"
Total number of plans needed:    

Revisions

Minimum number of Sets Required:

*If revision is affecting any outside agency, more copies will be required. A copy will be distributed to each outside agency affected, unless a Certificate of No Change is provided with a signed coversheet

Standard Distribution Points

Site Review (SDID)

Project Specific Distribution Points

Health Department If there is Well and/or Septic
Proffer Review If related to a Zoning Application
Addressing
Wastewater (WPMD)
Fire Marshall Required for addressing changes as well
Water Authority (FCWA)
VDOT
Streetlights
Urban Forestry
Bonds and Agreements

Other Types of Plans

Plan Type # of Plans Distribute to:
Minor Revision - Infill Lot Grading Plan FAC Tech per District
Minor Revision - Conservation Plan FAC Tech per District
Minor Revision - Rough Grading Plan FAC Tech per District
Soils Report Geotech Review DP
Soils Report Revision Geotech Review DP
Parking Study Site Review DP
Parking Reductions Land Use Review DP**

*Additional copies may be requested
**Parking Reductions Only

Fairfax Virtual Assistant