Sleepy Hollow Road Walkways - Construction Summary

 
  • Project No. – 2G40-088-028
  • Project Engineer – Tom Cutler
  • Contractor – Fort Myer Construction Corporation
  • Location – Mason District
  • Scope – Construction of approximately 4,800 LF of concrete sidewalk, 690 SY of curb ramps, driveway entrances and 206 LF of retaining wall that will provide connectivity intended to fill in the missing links in the sidewalk network adjacent to Sleepy Hollow Road between Columbia Pike and Leesburg Pike. The sidewalk will connect the community to parks, two neighborhood pools, two schools, and transit corridors both north and south of the project limits, and related items.
  • Completion – April 2024