Route 50 Pedestrian Improvements (Jaguar Trail to Seven Corners)

The Route 50 Pedestrian Initiative Improvements will increase pedestrian safety, accessibility and mobility along Route 50 from Jaguar Trail to east of Seven Corners. A total of 10 projects are included in this initiative, providing enhanced pedestrian access and connectivity. The pedestrian improvements include construction of new walkways, crosswalks, ADA accessible curb ramps and bus stop pads. The $10 million initiative is funded through the federal-aid from the Congestion Mitigation and Air Quality Program and Regional Surface Transportation Program. Click on the image below to enlarge.

Route 50 Pedestrian Improvements Map

 

Project Number: Project Name: Description: Construction Schedule:
1) 1400055 - 2012 Rte. 50 Sidewalk from Cedar Hill Rd. to Allen St.  Approximately 1,600 linear feet of walkway improvements, including crosswalks, curb and gutter, curb cut ramps along the north side service road from Cedar Hill Road to Allen Street To Be Determined
2) 1400052 - 2012 Rte. 50 / Allen St. Intersection Intersection improvements including crosswalks and curb cut ramps Spring 2018 -
Fall 2018
3) 1400056 - 2012 Rte. 50 Sidewalk from Graham Rd. to Woodley Lane Approximately 400 linear feet of walkway improvements along south side of Route 50 from Graham Road to Woodley Lane To Be Determined
4) 1400053 - 2012 Rte. 50 at Woodlawn Ave. Intersection Approximately 1,200 linear feet of intersection and sidewalk connection improvements, including center medians, crosswalks, curb cut ramps, and bus stop pads from Woodlawn Avenue to Wayne Road Spring 2018 - 
Fall 2018
5) 1400057 - 2012 Rte. 50 Sidewalk from Woodlawn Ave. to church parking lot (east side) Approximately 550 linear feet of sidewalk improvements along the north side service road from Woodlawn Avenue to Iglesia de Santa Maria Episcopal Church Spring 2018 -
Fall 2018
6) 1400058 - 2012 Rte. 50 Sidewalk from Westcott St. to Annandale Rd. Approximately 2,500 linear feet of walkway improvements, including crosswalks and  curb cut ramps, along north side of Route 50 from Westcott Street to Annandale Road Spring 2018 -
Fall 2018
7) 1400059 - 2012 Rte. 50 Sidewalk from Annandale Rd. to Cherry St. Approximately 1,100 linear feet of walkway improvements, including crosswalks and  curb cut ramps, along north side of Route 50 from Annandale Road to Cherry Street To Be Determined
8) 1400060 - 2012 Rte. 50 Sidewalk from Meadow Ln. to Linden Ln.  Approximately 900 linear feet of walkway improvements, including curb and gutter, crosswalks and curb cut ramps, along north side of Route 50 from Cherry Street to Linden Lane To Be Determined
9) 1400061 - 2012 Rte. 50 Sidewalk from South St. to Aspen Ln. Approximately 1,300 linear feet of walkway improvements, including curb ramps and crosswalks,  along the south side Route 50 from South Street to Aspen Lane To Be Determined
10) 1400062 - 2012 Rte. 50 Sidewalk from Patrick Henry Dr. to Olin Dr. Approximately 350 linear feet of sidewalk improvements along south side service road from Patrick Henry Drive to Olin Drive To Be Determined

 

 

Contacts

For construction-related questions or comments, please contact: Vincent Martucci, Department of Public Works and Environmental Services Utilities Design and Construction Division, at 703-324-5079 (TTY 711).

For all other questions or comments on the projects, please contact Seyed Nabavi, Department of Transportation, Transportation Design Division, 703-877-5600 (TTY 711).

Fairfax Virtual Assistant