Rocky Branch Tributary at Ashlawn Park Stream Restoration - Construction Summary
Public Works and Environmental Services Alert:
CONTACT INFORMATION:
Our administrative offices are open to the public. Appointments are preferred. Please call or email 8 a.m. - 4:30 p.m., Monday – Friday
Scope: The work will include, but not limited to: grading, excavation, fill, stream alignment, in-stream and log structures, reinforced bed material, riparian corridor enhancement, replacing of two culvert pipes, 180 linear feet trail regrading. Natural channel design techniques will be used to develop a stable channel such as utilizing cross vane, boulder pool, rock steps, step pool, log vane, root wad toe, creating meandering riffle and low flow pool. The work also includes restoration of the disturbed area with native species/landscaping.