Difficult Run Tributary At Government Center - Construction Summary
Public Works and Environmental Services Alert:
CONTACT INFORMATION:
Our administrative offices are open to the public. Appointments are preferred. Please call or email 8 a.m. - 4:30 p.m., Monday – Friday
Difficult Run Tributary At Government Center - Construction Summary
2023-04-18T13:00:00
2023-04-18T13:00:00
Project No. – SD-000031-231
Project Engineer – Ian Vinson
Contractors - KBS Earthworks, Inc.
Location: Braddock District
Scope: The work will include, but not limited to: grading, excavation, fill, stream alignment, in-stream and log structures, reinforced bed material, riparian corridor enhancement. NCD techniques will be used to develop a stable channel such as utilizing pool root wads, modified cross vanes, log sill cascades, toe logs, in-stream log sills, log vanes with rock sills, in-stream rock sills, root wad toes, creating meandering riffles and low flow pools. The work also includes restoration of the disturbed area with native species/landscaping, dredging of two ponds, and trail rehabilitation.