| Accotink Gravity Sewer Improvements Project - Construction Summary |
|
Accotink Gravity Sewer Improvements Project, located in the various street right of ways and in easements in the Hunters Branch Stream area in the vicinity of Nutley Drive. |
Wastewater |
|
Spring 2030 |
| Accotink Pump Station Rehabilitation Project - Construction Summary |
|
Rehabilitate the mechanical components of the Accotink Pump Station and replace the force main. |
Wastewater |
Mount Vernon District |
Fall 2028 |
| Adult Detention Center – Security Upgrades - Construction Summary |
|
Renovation of existing Adult Detention Center buildings’ including security upgrades and new security control room. |
Building |
Providence District |
Fall 2026 |
| Annual Contract for Bus Stop Construction Services 2022 - Construction Summary |
|
Annual Contract for Bus Stop Construction Services 2022 |
Transportation |
|
September 2027 |
| Annual Contract For Stormwater Improvements - Construction Summary |
|
Annual Contract For Stormwater Improvements |
Stormwater |
|
February 2028 |
| Annual Contract for Stream Restoration - Construction Summary |
|
Annual Contract for Stream Restoration |
Stormwater |
|
May 2028 |
| Annual Contract for Transportation Construction Services $3 Million - Construction Summary |
|
Annual Contract for Transportation Construction Services $3 Million |
Transportation |
|
October 2027 |
| Annual Contract for Transportation Construction Services $500K - Construction Summary |
|
Annual Contract for Transportation Construction Services $500K |
Transportation |
|
October 2027 |
| Dead Run Pump Station Valve Replacement - Construction Summary |
|
The project aims to extend the service life of the pump station and prevent unplanned breakdowns by replacing all the suction and discharge valves, adding a new bypass connection, and replacing the steel support for the pump shafts. |
Wastewater |
|
Winter 2027 |
| Dogue Creek Tributary At Greendale Golf Course Stream Restoration (DC9214) & WP0213 Dredging - Construction Summary |
|
Dogue Creek Tributary at Greendale Golf Course Stream Restoration (DC9214) & WP0213 Dredging |
Stormwater |
Franconia District |
May 2027 |
| FF Filter Gates Improvements Project - Construction Summary |
|
Construction of the FF Filter Gates Improvements Project, at the Noman M. Cole, Jr., Pollution Control Plant (NCPCP) located at 9399 Richmond Highway, Lorton, Virginia 22079. |
Wastewater |
|
Winter 2027 |
| Franconia Police Station and Governmental Center, Kingstowne Early Childcare, and Kingstowne Library - Construction Summary |
|
A new Franconia Police Station, Franconia District Supervisor’s Office, and Franconia Museum co-located with a 30,000 SF Kingstowne Regional Library and 8,000 SF Active Adult Center and with the new 10,000 SF Kingstowne Early Childcare Center. |
Building |
Franconia District |
Winter 2026 |
| Gadsen Drive Capacity Improvements - Construction Summary |
|
Design and construction of a new replace in kind 12” diameter 900 PVC gravity sewer with by-pass pumping |
Wastewater |
|
Fall 2027 |
| Lakevale Estates Collection Improvements - Construction Summary |
|
The project consists of improvements to the collection system downstream of the Lakevale Estates Pump Station in order to increase capacity to mitigate current and future risk of sewer surcharging. |
Wastewater |
|
Summer 2027 |
| Little Hunting Creek Force Main Project - Construction Summary |
|
Little Hunting Creek Force Main Project Construction Summary |
Wastewater |
|
November 2026 |
| Mason District Police Station - Construction Summary |
|
Renovation of the existing Police Station includes upgrades to the building systems, interior finishes, and expansion of the facility. |
Building |
Mason District |
Fall 2027 |
| Old Courthouse Road at Besley Road Realignment Project |
|
Old Courthouse Road at Besley Road Realignment Project is part of the spot improvement program in the Hunter Mill District of Fairfax County |
Transportation |
Hunter Mill District |
TBD |
| Operational Support Bureau - Construction Summary |
|
New 36,600 SF building, 8,000 SF motorcycle building, 3,250 SF vehicle building, and 2,750 SF inspection building. |
Building |
Mason District |
Fall 2026 |
| Park Terrace Manhole - Construction Summary |
|
The project aims to fix problems with the sewer system in the backyards along Park Terrace Dr, which was damaged by a 1978 landslide and poorly repaired. A new manhole, MH-200A, will be built between MH-200 and MH-199. |
Wastewater |
|
Spring 2027 |
| Penderbrook and Wesley House Pump Stations Rehabilitation Project - Construction Summary |
|
Rehabilitation of two pump stations, Penderbrook Pump Station and Wesley House Pump Station. This work is necessary to address aging assets and bring these two existing pump stations up to modern standards. |
Wastewater |
|
November 2026 |
| Primary - Secondary Sustaining Project 1 - Construction Summary |
|
Project will meet short-term rehabilitation needs of primary & secondary facilities at the Noman M. Cole, Jr. Water Recycling Facility. The scope includes 106 elements to improve the safety and operations for the next 15 years. |
Wastewater |
Mount Vernon District |
March 2027 |
| Raw Wastewater Pumping System Rehabilitation/Replacement -B4 - Construction Summary |
|
This project is to rehabilitate B2 equalization pump station, to construct B4 new pump station with the associated force mains and to demolish the existing B raw wastewater pump station. |
Wastewater |
Mount Vernon District |
Spring 2030 |
| Solids Processing Rehabilitation Phase III - Construction Summary |
|
Rehabilitation of solids-related processes including incineration, sludge storage, ash collection, scum concentration, supporting processes, and supporting facilities. Rehabilitation and demolition of buildings. Replacement of the truck weigh scale. |
Wastewater |
Mount Vernon District |
December 2027 |
| Stormwater and Wastewater Consolidation Facility - Construction Summary |
|
This project consolidates Stormwater and Wastewater functions for integrated services, is a showcase and educational facility that exemplifies sustainable features, and includes administrative office building, maintenance and storage buildings. |
Building |
Braddock District |
Fall 2026 |
| Tucker Avenue Neighborhood Stormwater Improvements - Construction Summary |
|
Project will improve stormwater drainage conditions and infrastructure, reduce localized flooding and erosion, improve water quality, and protect the adjacent Pimmit Run Stream. |
Stormwater |
Dranesville District |
April 2026 |
| Tysons West Phase 2 - Construction Summary |
|
The project consists of new 17 million gallons per day wastewater pump station, a generator building with redundant wet wells, solids management with mechanical and manually cleaned bar screens, and demolition of the existing Tysons Dodge pump station. |
Wastewater |
|
Winter 2028 |
| WW Meter Improvements FW Corbalis Plant - Construction Summary |
|
Replacement of Fairfax Water Corbalis wastewater flow meter vault. This flow meter vault was originally part of the Integrated Sewer Metering Improvements Project 4. |
Wastewater |
|
Fall 2026 |