$100 Million Funding Active Transportation Projects

In Fall 2021, the Fairfax County Board of Supervisors set a goal to identify $100 million over a six-year period and make one-time investments in pedestrian and bicycle infrastructure, and directed the Department of Transportation to compile a list of potential Active Transportation Access and Safety Improvements and to develop a prioritization process for implementation. The focus on safe bicycle and pedestrian access for all county residents, especially near schools, parks, activity and revitalization center and transit station areas was the priority.

Learn about the criteria and methodology used - the project prioritization process- to narrow down projects.

Project Name Project Number District Scope Status
(as of
June 2024)
Beulah Road / 
Abbotsford Drive
2G40-197-032 Hunter Mill Install pedestrian refuge island at existing crosswalk  Design
Beverly Road / Old Dominion Drive 2G40-197-016 Dranesville Construct 50 linear feet of 10' wide asphalt path along Beverly Road, including an ADA curb ramp at Old Dominion Drive Cancelled
Birch Road from Birch Grove Court to Kirby Road 2G40-197-052 Dranesville Construct ~470 linear feet of missing active transportation link on east or west side. Funding for preliminary engineering and partial funding for land acquisition and utilities. Project Initiation
Blake Lane / Bushman Drive 2G40-197-010 Providence Crosswalk Improvements / Install Rectangular Rapid Flashing Beacons across intersection Design
Blake Lane / Bel Glade Drive ST-000053-009 Providence Relocate crosswalk to south leg; install Rectangular Rapid Flashing Beacons across intersection and relocate bus stops Project Initiation
Bluemont Way / Explorer Street ST-000053-004 Hunter Mill Install Rectangular Rapid Flashing Beacons and pedestrian refuge island on westbound approach Land Acquisition
Bluemont Way / Library Street 2G40-197-034 Hunter Mill Relocate existing sidewalk to east leg; add pedestrian refuge island and ADA curb ramps Design
Braddock Road from Newton Patent Drive to Cedar Break Drive ST-000053-017 Sully Construct ~900 linear feet of missing active transportation link on north side, including bridge over Big Rocky Run. Funding for preliminary engineering. Project Initiation
Braddock Road / Witch Hazel Road 2G40-197-007 Mason Install pedestrian refuge island Complete
Buckman Road from Martha Washington Street/Martha Street to Bianca Place 2G40-197-053 Franconia Construct ~130 feet of missing active-transportation link on the south side. Add new marked crosswalks crossing Buckman Road and Martha Street. Project Initiation
Carrleigh Parkway / Donset Drive 2G40-197-046 Braddock Add new marked crosswalk and pedestrian refuge island crossing Carrleigh Parkway Project Initiation
Centreville Farms Road / Calamint Court 2G40-197-038 Sully Install pedestrian refuge island at existing crosswalk Project Initiation
Colts Neck Road from Reston Parkway to Jackstay Terrace Study 2G40-197-044 Hunter Mill Study for ~2,400 linear of trail along Colts Neck Road from Reston Parkway to approximately 200 feet south of Jackstay Terrace. Project Initiation
Columbia Pike from Blair Road to Gordon Street 2G40-197-058 Mason Construct ~300 linear feet of missing active-transportation link on north side. Project Initiation
Columbia Pike / Tyler Street 2G40-197-020 Mason Install Pedestrian Hybrid Beacon (PHB) at existing crosswalk (Consider RRFB and pedestrian refuge island if PHB is not feasible) Project Initiation
Cumberland Road from Amherst Avenue to Backlick Road 2G40-197-054 Franconia Construct ~220 feet of missing active transportation link on north side. Project Initiation
Elm Street / Chain Bridge Road ST-000005-007 Dranesville Install 25 linear feet of sidewalk and curb ramps  Design
Elm Street / Old Dominion Drive 2G40-197-017 Dranesville Install 25 linear feet of sidewalk, ADA curb ramps Project Initiation
Eskridge Road / District Avenue ST-000053-014 Providence Relocate crosswalk to south leg; install pedestrian refuge island or Rectangular Rapid Flashing Beacons Project Initiation
Eskridge Road / Merrifield Cinema Drive 2G40-197-027 Providence Relocate existing crosswalk and install pedestrian refuge island Project Initiation
Eskridge Road from Strawberry Lane to Merrifield Town Center Drive Study 2G40-197-045 Providence Conduct "Road Diet" Study on Eskridge Road with signage and striping changes that reduce vehicular lane(s) and add bicycle lanes. Study may include potential to expand project limits, depending on traffic analysis. Project Initiation
Fair Lakes Boulevard / Sedghurst Drive ST-000053-012 Springfield Relocate existing crosswalk and install pedestrian refuge island; study potential RRFBs Project Initiation
Fort Hunt Road from Belle Haven Country Club Entrance to Woodmont Road 2G40-197-061 Mount Vernon Widen pavement to add climbing (uphill) bike lane for ~850 linear feet. Project will create a bicycle lane connection from Richmond Highway to Belle View Boulevard. Project Initiation
Fort Hunt Road and Westgrove Road / Rollins Drive 2G40-197-062 Mount Vernon Upgrade crosswalk with Rectangular Rapid Flashing Beacons Project Initiation
Frying Pan Road and Greg Roy Lane / Dakota Lakes Drive ST-000053-016 Hunter Mill Upgrade existing marked crosswalk with pedestrian refuge island and/or Rectangular Rapid Flashing Beacons Project Initiation
Gambrill Road from Gambrill Woods Way to Kings Ridge Court 2G40-197-068 Springfield Construct ~200 linear feet of missing  active-transportation  link on east side. Add new marked crosswalk crossing Gambrill Road at Gambrill Woods Way. Project Initiation
Georgetown Pike / Great Falls Library 2G40-197-003 Dranesville Install pedestrian refuge island Design
Georgetown Pike / Walker Road 2G40-197-050 Dranesville Add signalized crosswalks on east and north legs of intersection Project Initiation
Glade Drive / Charterhouse Circle 2G40-197-056 Hunter Mill Upgrade existing marked crosswalk with pedestrian refuge island and/or curb extension(s) Project Initiation
Graham Road / Rosemary Lane 2G40-197-035 Providence Install pedestrian refuge island at existing crosswalk Design
Grantham Street from Victoria Road to Cromwell Drive 2G40-197-047 Braddock Construct ~270 linear feet of missing active-transportation link on the west side Project Initiation
Green Range Drive / Pyrenees Court 2G40-197-006 Hunter Mill Install ADA curb ramps and a high-visibility crosswalk near Dogwood Pool Complete
Guinea Road / Bronte Drive 2G40-197-002 Braddock Install high-visibility crosswalks, ADA curb ramps and a pedestrian refuge island; relocate bus stops Design
Guinea Road / Lakepointe Drive ST-000053-015 Braddock Install Rectangular Rapid Flashing Beacons Design
Guinea Road / Pierrpont Street 2G40-197-028 Braddock Relocate crosswalk to south leg. Install pedestrian refuge island, ADA curb ramps and sidewalk connection to relocated bus stops. Study potential RRFBs.  Project Initiation
Guinea Road / Rutherford Park ST-000053-002 Braddock Install RRFBs, curb extension and ADA curb ramps Design
Haycock Road / Casemont Drive 2G40-197-022 Dranesville Install curb extensions, ADA curb ramps and a high-visibility crosswalk Project Initiation
Heritage Drive / Commons Drive 2G40-197-030 Braddock, Mason Install pedestrian refuge island at existing sidewalk Design
Heritage Drive / Rectory Lane 2G40-197-029 Braddock, Mason Install pedestrian refuge island at existing sidewalk Design
Hooes Road / Dudley Drive / Laurel Crest Drive 2G40-197-009 Mount Vernon Install ADA curb ramps and a high-visibility crosswalk Project Initiation
Hooes Road / South Run Stream Valley Trail ST-000053-005 Mount Vernon, Springfield Install passive detection, RRFBs and no parking signs Design
Huntington Avenue / Fenwick Drive 2G40-197-025 Mount Vernon Add signalized crosswalk on west leg with ADA curb ramps, push buttons and a pedestrian signal head per Huntington Metrorail Area Active Transportation Study Project Initiation
Huntington Avenue / Robinson Way ST-000053-013 Mount Vernon Relocate crosswalk west of Robinson Way; install pedestrian refuge island, RRFBs and connection to service road Design
Idylwood Road / Montview Court 2G40-197-023 Dranesville Install pedestrian refuge island and curb extensions at existing crosswalk Project Initiation
Kingstowne Village Parkway / Cross Gate Lane 2G40-197-005 Franconia Install pedestrian refuge island on eastbound approach; relocate and improve bus stops Land Acquisition
Kingstowne Village Parkway / Park Village Drive 2G40-197-004 Franconia Install pedestrian refuge island, ADA curb ramps and bus landing pads Land Acquisition
Lake Braddock Drive / Raintree Road 2G40-197-048 Braddock Upgrade existing crosswalk with pedestrian refuge island and curb ramps Project Initiation
Lawyers Road / Blue Spruce Road 2G40-197-057 Hunter Mill Add new marked crosswalk with pedestrian refuge island, curb ramps. Possible curb extension or channelized right-turn island. Project Initiation
Leesburg Pike from Seminary Road to Carlin Springs Road 2G40-197-051 Dranesville, Providence Improve existing signalized crosswalks by reducing crossing distance at Shreve Road and Haycock Road by removing the additional southbound through lane on Haycock Road and reducing Shreve Road to one lane at the intersection. Improvements identified in West Falls Church Metrorail Area Active Transportation Study. Developer proffer of $500k available for project. Project Initiation
Leesburg Pike and Shreve Road / Haycock Road 2G40-197-059 Mason Construct ~150 linear feet of missing active transportation path link on south side Project Initiation
Leland Road / Sammie Kay Lane 2G40-197-039 Sully Install pedestrian refuge island at existing crosswalk Design
Lockheed Blvd. from Hybla Valley ES to Huntley Meadows Park 2G40-197-018 Franconia Construct Active Transportation facility Project Initiation
Lorton Station Boulevard / Harrover Place ST-000053-010 Mount Vernon Relocate existing crosswalk and install pedestrian refuge island; study RRFBs Design
Magarity Road / Kennedy Drive 2G40-197-031 Dranesville, Providence Install pedestrian refuge island and relocate bus stops at existing crosswalk Design
Monument Drive / Monument Court 2G40-197-069 Springfield Add new marked crosswalk with pedestrian refuge island and curb ramps Project Initiation
Mount Vernon Highway / Battersea Lane 2G40-197-064 Mount Vernon Upgrade existing crosswalk with pedestrian refuge islands and possible curb extension(s) Project Initiation
Murray Lane / Early Street 2G40-197-008 Mason Install ADA curb ramps and a high-visibility crosswalk Complete
Newington Road between Telegraph Road / One Drive (Dupell Park) 2G40-197-063 Mount Vernon Construct 2,200 linear feet of missing active-transportation link on the north side of Newington Road. Funding for preliminary engineering. Project Initiation
North Kings Highway / Mount Eagle Elementary School 2G40-197-055 Franconia, Mount Vernon Consolidate two crosswalks across North Kings Highway at Mount Eagle Elementary School to one crossing with a Pedestrian Hybrid Beacon Project Initiation
Olley Lane / Eastwood Court 2G40-197-049 Braddock Upgrade existing crosswalk with pedestrian refuge island and/or Rectangular Rapid Flashing Beacons Project Initiation
Patrick Henry Drive / Patrick Henry Drive 2G40-197-060 Mason Add new marked crosswalk with pedestrian refuge island and bus stop relocation(s) Project Initiation
Poplar Tree Road / Walney Road 2G40-197-071 Sully Construct missing active-transportation links and add missing signalized crossings on north, west and south legs. Project Initiation
Prosperity Avenue / Halstead II Lane 2G40-197-066 Providence Upgrade existing crosswalk with Rectangular Rapid Flashing Beacons Project Initiation
Redd Road / Idylwood Road 2G40-197-024 Dranesville Install high-visibility crosswalk and improve visibility by re-grading embankment Project Initiation
Rolling Road / Grigsby Drive 2G40-197-021 Braddock, Springfield Install traffic signal with pedestrian crossing improvements Complete
Route 7 from Magnolia Avenue across 5930 Leesburg Pike 2G40-197-019 Mason Connect gas station frontage with existing sidewalk at the shopping center to the east Project Initiation
Route 29, East of Nutley Street 2G40-197-067 Providence Construct ~150 linear feet of missing active transportation link on north side Project Initiation
Saint Germain Drive / Machen Road 2G40-197-026 Sully Upgrade signalized crosswalk markings and curb ramps. Possible signal modifications and additional improvements. Project Initiation
Silverbrook Road / Crosspointe Drive ST-000053-006 Springfield Install RRFBs, pedestrian refuge island and crosswalks Design
Stone Heather Drive / Franklin Farm Shopping Center 2G40-197-012 Sully Install ADA curb ramps and a high-visibility crosswalk Complete
Stringfellow Road / Foxfield Pool ST-000053-007 Sully Install passive detection, RRFBs and pedestrian refuge island Design
Stringfellow Road and Greenbriar Park / Big Rocky Run Trail 2G40-197-070 Springfield, Sully Upgrade existing crosswalk with Pedestrian Hybrid Beacon Project Initiation
Sunset Hills Road / Reston Station Boulevard 2G40-197-033 Hunter Mill Install ADA curb ramps and a high-visibility crosswalk Project Initiation
Sydenstricker Road / Arley Drive 2G40-197-036 Springfield Install pedestrian refuge island and ADA curb ramps; relocate bus stops Project Initiation
Tuttle Road Trail to Hillside Road ST-000053-011 Springfield Install approximately 1,100 linear feet of trail for connection; install crosswalk across Hillside Road Project Initiation
Westpark Drive from International Drive to Existing Sidewalk 2G40-197-065 Providence Construct ~200 linear feet of missing active transportation link on the north side Project Initiation

 