$100 Million for Active Transportation: Project Prioritization Process

Public Meetings Scheduled for March 11 and 12; District Surveys Open Until March 31

FCDOT staff will host a meeting to present an overview of the proposed list of prioritized pedestrian and bicycle improvement projects and take general questions regarding the prioritization process. 

Virtual Meetings:

Meeting Materials:

Project-specific comments and feedback may be submitted through the district surveys available below. Please submit comments by 4:30 p.m. on Tuesday, March 31, 2026.


The Fairfax County Board of Supervisors has set a goal to invest $100 million in bicycle and pedestrian infrastructure improvements between 2021 and 2027. In fall 2025, the board approved an additional $25.43 million in one-time funding for projects within each magisterial district. So far, $82.12 million has been committed, with the remaining $17.88 million expected to be allocated within the targeted timeframe.

        View Approved Funding and Projects

Working with district supervisors, the Fairfax County Department of Transportation (FCDOT) has created a list of proposed projects for each district. These focus on opportunity areas, high pedestrian and bicycle activity zones, and locations near key destinations like schools, parks and transit stops. These projects were identified through community and stakeholder feedback as well as recommendations from corridor studies and site reviews. The list of proposed projects to receive funding is available for public review and comment. 
 

WE WANT TO HEAR FROM YOU

Your feedback is critical to finalizing the prioritization and informing the selection of approved projects for available funding. Please review the proposed projects in your district below and share your feedback by participating in the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026. Survey links are included for each district in the listing below.

       Find My District

Please review the list of projects proposed for the Braddock District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

4. Burke Lake Road/Signal Hill DriveConstruct a pedestrian refuge in the existing crosswalk on Burke Lake Road at the Signal Hill Drive intersection and add or upgrade curb ramps and pedestrian-scale lighting.
16. Little River Turnpike from Wakefield Chapel Road to Lake DriveConstruct approximately 900 feet of Active Transportation facilities along the south side of Little River Turnpike from Wakefield Chapel Road to Lake Drive.
21. Little River Turnpike/I-495 North Exit RampImprove the existing trail crossing on the south side of Little River Turnpike at the Exit Ramp to I-495 North and the existing trail intersection at Accotink Parkway.
23. Monument Drive from Park Vista Boulevard to Government Center ParkwayConstruct approximately 650 feet of Active Transportation facilities along the west side of Monument Drive from Park Vista Boulevard to Government Center Parkway.
28. Maple Avenue/John Robert WayConstruct approximately 20 feet of Active Transportation facilities along the east side of Maple Avenue at the John Robert Way intersection.
32. Sideburn Road from 5225 Sideburn Road to Linfield StreetConstruct approximately 500 feet of Active Transportation facilities along the east side of Sideburn Road from 5225 Sideburn Road to Linfield Street.
55. Holly Avenue/Route 29Construct approximately 1,000 feet of Active Transportation facilities along the west side of Holly Avenue north of Route 29.
57. Monument Drive from Monument Hill Way to Government Center ParkwayConstruct approximately 1,500 feet of Active Transportation facilities along the west side of Monument Drive from Monument Hill Way to Government Center Parkway.
242. Heritage Drive from Little River Turnpike to Heritage Woods WayImprove approximately 600 feet of Active Transportation facilities on Heritage Drive between Little River Turnpike and Heritage Woods Way.
628. Heming Avenue from Braddock Road to Heming AvenueConstruct approximately 80 feet of Active Transportation facilities on Heming Avenue from Braddock Road south to the existing sidewalks along Heming Avenue.
629. Heritage Drive/Four Year RunImprove the existing marked crosswalk on Heritage Drive at the Four Year Run intersection near Annandale High School by installing curb extensions and on-street parking restrictions.
631. Little River Turnpike/Guinea RoadImprove Active Transportation facilities at the Little River Turnpike and Guinea Road intersection to possibly include an additional marked crosswalk, new curb ramps, and approximately 50 feet of connection at the northeast corner of the intersection.
632. Random Hills Road/Ridgetop Road/Verret DriveRelocate the existing marked crosswalk on Random Hills Road at the intersection with Ridgetop Road and Verret Drive to the western approach of the intersection, construct a pedestrian refuge island, and upgrade pedestrian-scale lighting and signage.
669. Route 29 from Legato Road to Piney Ridge Branch RoadConstruct approximately 750 feet of Active Transportation facilities on the north side of Route 29 from Legato Road to Piney Ridge Branch Road.
681. Hunter Village Drive from Old Keene Mill Road to Gerry Connolly Cross County TrailConstruct approximately 300 feet of Active Transportation facilities on the east side of Hunter Village Drive from Old Keene Mill Road to the Gerry Connolly Cross County Trail.
721. Guinea Road/Olley Lane/Harford LaneImprove pedestrian crossings at the Guinea Road intersection with Olley Lane and Harford Lane by upgrading crosswalk to high-visibility markings, potentially adding pedestrian refuges and additional crosswalk, upgrading curb ramps and pedestrian lighting.

Please review the list of projects proposed for the Dranesville District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

68. Coppermine Road from Centreville Road to Sunrise Valley DriveInstall approximately 4,000 feet of bike lanes on Coppermine Road from Centreville Road to Sunrise Valley Drive.
73. Dolley Madison Boulevard/Old Dominion DriveUpgrade all the existing crosswalks at the Dolley Madison Boulevard and Old Dominion Drive intersection to high-visibility markings, reconstruct curb ramps, and add or upgrade pedestrian-scale lighting at the intersection.
77. Great Falls Street/Moly DriveInstall new marked crosswalk and pedestrian refuge on Great Falls Street at Moly Drive, reconstruct curb ramps, and add or upgrade pedestrian-scale lighting.
84. Kensington Road from Dolley Madison Boulevard to Melrose DriveConstruct approximately 1,200 feet of Active Transportation facilities along Kensington Road from Dolley Madison Boulevard to Melrose Drive.
105. Park Avenue from Old Dominion Drive to Spring Vale AvenueConstruct approximately 600 feet of Active Transportation facilities along Park Avenue from Old Dominion Drive to Spring Vale Avenue.
111. Birch Road from Kirby Road to Birch Grove CourtConstruct approximately 500 feet of Active Transportation facilities on the east side of Birch Road from Kirby Road to Birch Grove Court.
122.  Chain Bridge Road/Salona Village Shopping CenterConstruct a median pedestrian refuge and curb ramps for the existing crosswalk on Chain Bridge Road at the Salona Village Shopping Center entrance.
704. Churchill Road/McLean Park TrailImprove the existing crosswalk across Churchill Road connecting to the McLean Central Park Trail between Dead Run Drive and Ingleside Avenue including upgraded signage and pedestrian-scale lighting.
705. Lewinsville Road/Bridle Path Lane/Falstaff RoadInstall a marked crosswalk across Lewinsville Road at Bridle Path Lane/Falstaff Road including potential pedestrian refuge, curb extensions, upgraded signage, and pedestrian-scale lighting.
709. Live Oak Drive from Langley Swim and Tennis Club to the Potomac Heritage National Scenic TrailConduct a study to evaluate the feasibility of constructing approximately 3,800 feet of Active Transportation facilities along Live Oak Drive from the Langley Swim and Tennis Club to the Potomac Heritage National Scenic Trail. (Updated Feb. 26, 2026)
714. Great Falls Street/Sea Cliff RoadImprove the existing marked crosswalk on Great Falls Street at Sea Cliff Road including potential pedestrian refuge, curb extensions, upgraded signage, and pedestrian-scale lighting.
715. Walker Road/Columbine StreetImprove the existing marked crosswalk on Walker Road that connects the Village Centre shopping plaza north of Columbine Street to the shopping center on the east side of Walker Road by installing upgrade signage and pedestrian refuge.
716. Lewinsville Road from Old Falls Road to Meadow Green LaneConstruct approximately 1,200 feet of Active Transportation facilities along the north side of Lewinsville Road from Old Falls Road to the existing sidewalk east of Meadow Green Lane.
719. Old Dominion Drive/Spring Hill RoadInstall marked crosswalks at Old Dominion Drive and Spring Hill Road intersection, construct 130 feet of Active Transportation facilities along the west side of Spring Hill Road and a crosswalk connecting to existing trail at the VFW entrance.
720. Utterback Store Road/Loran RoadConstruct approximately 1,100 feet of Active Transportation facilities on the west side of Utterback Store Road from Leesburg Pike to Loran Road including a marked crosswalk, upgraded curb ramps, and pedestrian signage across Utterback Store Road at Loran Road near Forestville Elementary School. (Updated Feb. 26, 2026)

Please review the list of projects proposed for the Franconia District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

132. South Kings Highway/Memorial StreetInstall additional marked crosswalks, reconstructed curb ramps, and upgraded pedestrian-scale lighting at the South Kings Highway and Memorial Street intersection.
152. Buckman Road/Janna Lee AvenueConstruct approximately 400 feet of Active Transportation facilities on the south side of Buckman Road and the west side of Janna Lee Avenue near El Camino Place. Restripe and add crosswalks, curb ramps, and refuge at Buckman Road and Janna Lee Avenue.
157. Lockheed Boulevard/Fordson RoadInstall additional marked crosswalks, reconstructed curb ramps, and upgraded pedestrian-scale lighting at the Lockheed Boulevard and Fordson Road intersection.
163. North Kings Highway/Fairhaven AvenueInstall marked crosswalk across North Kings Highway at Fairhaven Avenue including reconstructed curb ramps, upgraded pedestrian lighting, and signage.
639. Fordson Road/Cyrene BoulevardConstruct a median pedestrian refuge island in the cross-hatched area of the existing crosswalk on Fordson Road at Cyrene Boulevard including reconstructed curb ramps, upgraded pedestrian lighting, and signage.
640. Kalmia Street from Elder Avenue to Hackberry StreetConstruct approximately 1,100 feet of Active Transportation facilities on Kalmia Street from Elder Avenue to Hackberry Street.
641. Ladson Lane/Evergreen Farm PlaceInstall a marked crosswalk on Ladson Lane at Evergreen Farm Place and the Costco entrance including potential curb extensions, upgraded curb ramps, pedestrian lighting, and signage.
643.  Hackberry Street/Melia StreetConstruct approximately 350 feet of trail connecting the intersection of Hackberry Street and Melia Street to the existing WMATA trail to provide pedestrian access to the Franconia Springfield Metro.
681. Hunter Village Drive from Old Keene Mill Road to the Gerry Connolly Cross County TrailConstruct approximately 125 feet of Active Transportation facilities on the east side of Hunter Village Drive from Old Keene Mill Road to the Gerry Connolly Cross County Trail.
685. Backlick Road/Spring GardenInstall new marked crosswalks on the northern and western approaches of the Backlick Road and Spring Garden intersection including upgraded curb ramps, pedestrian lighting, and signage.
707. Franconia Road/Westchester StreetImprove the existing marked crosswalk on Franconia Road at Westchester Street including upgraded pedestrian-lighting and signage.
722. Poag Street/Shaffer DriveConstruct approximately 50 feet of Active Transportation facilities at the end of the Poag Street cul-de-sac at the existing connection to Shaffer Drive.
731. Morning View Lane/Tassia DriveImprove the existing marked crosswalk on Morning View Lane at the Island Creek Elementary entrance and Tassia Drive including modified curb ramps, upgraded pedestrian lighting, and potentially curb extensions, or refuge island.
732. Franconia Road/Craft RoadImprove the existing marked crosswalk on Franconia Road at the Mark Twain Elementary entrance and Craft Road by upgrading pedestrian lighting and potentially constructing curb extensions or pedestrian refuge island.

Please review the list of projects proposed for the Hunter Mill District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

68. Coppermine Road from Centreville Road to Sunrise Valley DriveInstall approximately 4,000 feet of bike lanes on Coppermine Road from Centreville Road to Sunrise Valley Drive.
123. Centerville Road/Floris Elementary SchoolInstall new marked crosswalk with pedestrian refuge island, reconstructed curb ramps, and upgraded pedestrian-scale lighting at the entrance to Floris Elementary School on Centreville Road.
193. West Ox Road from Rodgers Lane to Floris LaneConstruct approximately 600 feet of Active Transportation facilities along the south side of West Ox Road between Rodgers Lane and Floris Lane including a new marked crosswalk and pedestrian-scale lighting at Frying Pan Farm Park.
196. Stevenage Road from Bennington Woods Road to Reston ParkwayConstruct 700 feet of Active Transportation facilities on the south side of Stevenage Road from Bracknell Drive west to existing sidewalk at shopping center entrance. Install crosswalks on Stevenage Road between Bennington Woods Road and Reston Parkway.
203. Colts Neck Road from Glade Drive to Branleigh Park CourtConstruct approximately 600 feet of Active Transportation facilities along the west side of Colts Neck Road from Glade Drive to Branleigh Park Court.
205. Sunrise Valley Drive from Glade Drive to the Fairfax County ParkwayReplace existing substandard facility with approximately 550 feet of Active Transportation facilities along the north side of Sunrise Valley drive between Glade Drive and Fairfax County Parkway.
645. Fairway Drive from Wiehle Avenue to South Shore RoadConstruct approximately 500 feet of Active Transportation facilities on the north side of Fairway Drive from Wiehle Avenue to South Shore Road.
647. Reston Parkway from Bowman Green Drive to Spectrum CenterConstruct approximately 550 feet of Active Transportation facilities on the east side of Reston Parkway from the existing trail north of Bowman Green Drive to Spectrum Center. Add new marked crosswalk and curb ramps on Reston Parkway at Spectrum Center.
648. Reston Parkway/Hopper StreetConstruct signalized pedestrian marked crosswalk with median refuge across Reston Parkway at the Hopper Street intersection.
649. Ridge heights Road from South Lakes Drive to Lakewinds DriveConstruct approximately 600 feet of Active Transportation facilities on the south side of Ridge Heights Road from South Lakes Drive to the sidewalk across from Lakewinds Drive. Add crosswalk with new curb ramps and pedestrian lighting at Lakewinds Drive.
650. Sunrise Valley Drive/Lakeport WayInstall new marked crosswalk with pedestrian refuge island, reconstructed curb ramps, upgraded signage and pedestrian-scale lighting across Sunrise Valley Drive at Lakeport Way.
651. Sunrise Valley Drive from Soapstone Drive to Indian Ridge RoadConstruct approximately 850 feet of Active Transportation facilities on the south side of Sunrise Valley Drive from Soapstone Drive to Indian Ridge Road.
654. Westwood Center Drive/Sheraton Tysons DriveConstruct a marked crosswalk with pedestrian signals and curb ramps crossing Westwood Center Drive at Sheraton Tysons Drive.
655. Wiehle Avenue/Reston Station BoulevardInstall a signalized crosswalk on the southern approach of the Wiehle Avenue and Reston Station Boulevard intersection.
729. Fairway Drive/Apricot CourtInstall a mid-block marked crosswalk with curb ramps on Fairway Drive near Apricot Court to provide pedestrian access to the Hook Road Recreational Area park.

Please review the list of projects proposed for the Mason District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

230. Columbia Pike at Mason District ParkImprove Active Transportation facilities at the Mason District Park entrance and trail on the south side of Columbia Pike including possible additional crosswalk and trail connection, median cut-throughs, upgraded curb ramps and pedestrian-scale lighting.
231. Columbia Pike/Sleepy Hollow RoadExtend the existing trail on the south side of Columbia Pike approximately 350 feet east to Sleepy Hollow Road. Install signalized crosswalk on Columbia Pike at Sleepy Hollow Road with reconstructed curb ramps and pedestrian-scale lighting.
254. Arlington Boulevard/ Graham RoadImprove Active Transportation facilities at Arlington Boulevard and Graham Road including potential additional marked crosswalk, median cut-throughs and pedestrian refuge, reconstructed curb ramps, and upgraded pedestrian-scale lighting.
263. Little River Turnpike from Lake Drive to 8428 Little River TurnpikeConstruct approximately 600 feet of Active Transportation facilities along the north side of Little River Turnpike from the Lake Drive intersection to the existing sidewalk at 8428 Little River Turnpike.
270. Seminary Road/Carlin Springs RoadConstruct approximately 200 feet of Active Transportation facilities along the north side of Seminary Road just west of the Carlin Springs Road intersection, upgrade curb ramps, and install pedestrian-scale lighting.
271. Carlin Springs Road/Seminary RoadConstruct approximately 200 feet of Active Transportation facilities along the west side of Carlin Springs Road just north of the Seminary Road intersection, upgrade curb ramps, and install pedestrian-scale lighting.
280. Little River Turnpike from Roberts Avenue to High PlaceConstruct approximately 600 feet of Active Transportation facilities along the north side of Little River Turnpike from the service road east of Roberts Avenue to the service road east of High Place including new curb ramps and pedestrian-scale lighting.
302. Leesburg Pike from Rock Spring Avenue to Crossroads Center WayUpgrade the existing Active Transportation facilities along the north side of Leesburg Pike between Rock Spring Avenue and Crossroads Center Way including reconstructed curb ramps and pedestrian-scale lighting.
320. Columbia Pike/Eastbound Leesburg Pike and Seminary Road rampConstruct new signalized crosswalk across Columbia Pike at the eastbound Leesburg Pike and Seminary Road ramp including reconstructed curb ramps and pedestrian-scale lighting.
323. Leesburg Pike/Aldi Shopping CenterConstruct approximately 10 feet of Active Transportation facilities including installing a new curb ramp to provide pedestrian access from the existing sidewalk on the north side of Leesburg Pike to the Aldi shopping center.
452. Arlington Boulevard/Thomas Jefferson LibraryInstall Pedestrian Hybrid Beacon at the existing marked crosswalk across Arlington Boulevard near the entrance to Thomas Jefferson Library. Relocate eastbound and westbound bus stops and construct new Active Transportation connections and boarding pads.
453. Route 50/Allen StreetInstall additional crosswalks, upgrade parallel style crosswalk to high-visibility markings, relocate existing crosswalk, construct pedestrian refuge(s), reconstruct curb ramps, and install pedestrian- scale lighting at Route 50 and Allen Street.
631. Little River Turnpike/Guinea RoadImprove Active Transportation facilities at the Little River Turnpike and Guinea Road intersection to possibly include an additional marked crosswalk, new curb ramps, and approximately 50 feet of connection at the northeast corner of the intersection.
657. Little River Turnpike/Woodland RoadConstruct bus pad and Active Transportation facilities connecting to the bus stop on the south side of Little River Turnpike east of Woodland Road. Install a marked crosswalk and curb ramps at the bus stop in front of Little River Shopping Center.
688. Gallows Road from Holes Run Drive to I-495 North rampConstruct approximately 200 feet of Active Transportation facilities on the north side of Gallows Road from the existing sidewalk west of Holmes Run Drive to the I-495 North ramp including a new crosswalk on Gallows Road at Holmes Run Drive.
711. Woodburn Road/Spicewood Drive and Robey AvenueInstall Rectangular Rapid Flashing Beacons at the crosswalk on Woodburn Road at the Gerry Connolly Cross County Trail crossing between Spicewood Drive and Robey Avenue.

Please review the list of projects proposed for the Mount Vernon District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

163. North Kings Highway/Fairhaven AvenueInstall high-visibility marked crosswalk across North Kings Highway at Fairhaven Avenue. Reconstruct existing curb ramps and upgrade pedestrian-scale lighting.
166. Sherwood Hall Lane/Parkers LaneInstall pedestrian signals at Sherwood Hall Lane and Parkers Lane. Add curb ramps on the eastern approach crosswalk. Upgrade southern approach crosswalk markings to high-visibility. Upgrade pedestrian facilities for both separated right-turn lane islands.
337. Lorton Station Boulevard at the Stonegarden Drive/Grace Church Lane and Lee Masey Drive/Old Beech Court intersectionsImprove two existing crosswalks on Lorton Station Boulevard at the Stonegarden Drive/Grace Church Lane and Lee Masey Drive/Old Beech Court intersections by constructing pedestrian refuges and upgrading curb ramps, signage, and pedestrian lighting.
345. Fairview Drive from Eastern Grid Street to the existing sidewalk east of Phillips DriveConstruct approximately 1,000 feet of Active Transportation facilities along the north side of Fairview Drive from Eastern Grid Street to the existing sidewalk east of Phillips Drive.
348. Radford Avenue from Jackson Place to the existing sidewalk south of Sonia CourtConstruct approximately 900 feet of Active Transportation facilities along the east side of Radford Avenue from Jackson Place to the existing sidewalk south of Sonia Court.
352. Richmond Highway from Armistead Road south to the existing sidewalk past the gas station entranceConstruct approximately 350 feet of Active Transportation facilities along the west side of Richmond Highway from Armistead Road south to the existing sidewalk past the gas station entrance.
357. Dart Drive from Richmond Highway BRT project limits to the existing sidewalk east of Mums DriveConstruct approximately 1,000 feet of Active Transportation facilities along the south side of Dart Drive from Richmond Highway BRT project limits to the existing sidewalk east of Mums Drive.
364. Rixey Drive/Byrd LaneInstall a new marked crosswalk across Rixey Drive at Byrd Lane with new curb ramps, pedestrian-scale lighting, and signage.
370. Sherwood Hall Lane from existing on-road bike lanes east of the Gum Springs Center entrance to tie into Richmond Highway BRT active transportation facilitiesImprove bicycle facilities on Sherwood Hall Lane from existing on-road bike lanes east of the Gum Springs Center entrance to tie into Richmond Highway BRT active transportation facilities.
619. From Cameron Run Terrace under Richmond Highway and connecting to the Mount Vernon Trail on the I-95 North rampConduct a feasibility study to construct approximately 1,400 feet of Active Transportation facilities from Cameron Run Terrace under Richmond Highway and connecting to the Mount Vernon Trail on the I-95 North ramp.
661. Lorton Road/Lorton Market StreetImprove pedestrian crossings at the Lorton Road and Lorton Market Street intersection by adding a high-visibility crosswalk on the western approach, constructing new curb ramps, and installing pedestrian-scale lighting.
662. Lorton Road/Lorton Station Boulevard/Armistead RoadImprove existing crosswalks at the Lorton Road intersection with Lorton Station Boulevard and Armistead Road by upgrading curb ramps and pedestrian lighting.
663. Pohick River Drive from Armistead Road to the end of the cul-de-sacConstruct approximately 1,300 feet of Active Transportation facilities along Pohick River Drive from Armistead Road to the end of the cul-de-sac.
664. Richmond Highway/Dutchman DriveImprove pedestrian crossings on Richmond Highway at Dutchman Drive and Lorton Community Center and Library by upgrading existing crosswalks to high-visibility markings, new curb ramps, and installing pedestrian lighting.

Please review the list of projects proposed for the Providence District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

120. Magarity Road from Lunceford Lane to Ware RoadConstruct approximately 850 feet of Active Transportation facilities along the south side of Magarity Road from Lunceford Lane to Ware Road.
254. Arlington Boulevard/Graham RoadImprove Active Transportation facilities at Arlington Boulevard and Graham Road including potential additional marked crosswalk, reconstructed curb ramps, and upgraded pedestrian-scale lighting.
413. Eskridge Road/Strawberry LaneImprove the existing marked crosswalk on Eskridge Road at Strawberry Lane by upgrading the pedestrian lighting and signage and potentially constructing a median pedestrian refuge.
414. Vaden Drive/Royal Victoria DriveUpgrade the Active Transportation crossings at the Vaden Drive and Royal Victoria Drive intersection to improve access to the Providence Community Center including adding and upgrading pedestrian signage, lighting, and curb ramps.
448. Route 29 from Dover Lane to Meadow View RoadConstruct approximately 450 feet of Active Transportation facilities along the south side of Route 29 from Dover Lane to Meadow View Road.
452. Arlington Boulevard/Thomas Jefferson Library EntranceInstall pedestrian hybrid beacon at existing crosswalk on Arlington Boulevard near the entrance to Thomas Jefferson Library. May include relocating eastbound and westbound bus stops and constructing new Active Transportation connections and boarding pads.
453. Route 50/Allen StreetRelocate eastern approach crosswalk at Route 50 and Allen Street, upgrade existing parallel crosswalks to high-visibility markings, install additional crosswalks and pedestrian refuges, reconstruct curb ramps, and install pedestrian-scale lighting.
478. Route 29 from Prosperity Avenue east to the existing Metrobus bus shelterConstruct approximately 300 feet of Active Transportation facilities along the south side of Route 29 from Prosperity Avenue east to the existing Metrobus bus shelter.
479. Hilltop Road/Old Lee HighwayImprove Active Transportation facilities at the intersection of Hilltop Road and Old Lee Highway.
484. Hollywood Road from Route 29 to the service road entranceConstruct approximately 100 feet of Active Transportation facilities along the west side of Hollywood Road from Route 29 to the service road entrance, including new intersection curb ramp(s).
485. Route 29 from Hollywood Road to Mary StreetConstruct approximately 1,000 feet of Active Transportation facilities along the north side of Route 29 from Hollywood Road to Mary Street.
486. Emma Lee Street from Route 29 north to the existing sidewalkConstruct approximately 75 feet of Active Transportation facilities and improved curb ramps on the west side of Emma Lee Street from Route 29 north to the existing sidewalk.
491. Blake Lane from Sutton Road south across the Blake Lane Bridge over I-66Improve Active Transportation facilities on Blake Lane from the Sutton Road intersection south across the Blake Lane bridge over I-66.
492. Route 29/Eskridge Road/Merrilee DriveImprove existing crosswalks at the Route 29 intersection with Eskridge Road and Merrilee Drive including upgraded curb ramps and pedestrian lighting as well as potential curb extensions.
494. Route 29/West StreetInstall new crosswalk on the western approach of Route 29 and West Street intersection including reconstructed curb ramps, pedestrian lighting, and Active Transportation connections to nearby bus stops. Install marked crosswalks on the service road.

Please review the list of projects proposed for the Springfield District below or view the interactive Active Transportation Project Prioritization Map. Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

536. Route 50/Stringfellow RoadImprove the existing crosswalks at the Route 50 and Stringfellow Road intersection including adding median pedestrian refuge.
540. Rolling Road from Edinburgh Drive to Tanner Robert CourtConstruct approximately 450 feet of Active Transportation facilities on the west side of Rolling Road from the southern Edinburgh Drive intersection to Tanner Robert Court.
542. Westbrook Drive from Stringfellow Road to Whisper Willow Drive and Collin Chase Place intersectionConstruct approximately 1,000 feet of Active Transportation facilities on Westbrook Drive from Stringfellow Road to the Whisper Willow Drive and Collin Chase Place intersection.
546. Route 29 from Piney Branch Road to West Ox RoadConstruct approximately 1,300 feet of Active Transportation facilities on the north side of Route 29 from Piney Branch Road to West Ox Road.
548. Old Keene Mill Road from Hillside Road to Bauer Drive and Greeley Boulevard IntersectionConstruct approximately 1,000 feet of Active Transportation facilities on the north side of Old Keene Mill Road from Hillside Road to the Bauer Drive and Greeley Boulevard intersection.
552. Monument Drive/Fair Ridge DriveImprove the existing crosswalks at the Monument Drive and Fair Ridge Drive intersection including constructing additional pedestrian refuge, reconstructing curb ramps, and installing or upgrading pedestrian-scale lighting.
565. Burke Road/Old Burke Lake RoadImprove Active Transportation facilities at the intersection of Burke Road and Old Burke Lake Road by installing marked crosswalks, new curb ramps, pedestrian refuges, and pedestrian-scale lighting.
568. Old Keene Mill Road from Field Baster Drive to Huntsman BoulevardConstruct approximately 1,400 feet of Active Transportation facilities on the south side of Old Keene Mill Road from the existing sidewalk east of Field Master Drive to Huntsman Boulevard.
569. Monument Drive/West Ox RoadImprove Active Transportation facilities at the Monument Drive and West Ox Road intersection including reconstructed curb cuts, curb ramps, pedestrian median refuges, and pedestrian island refuges.
630. Legato Road/Dixie Hill Road/Ruffin DriveUpgrade the existing marked crosswalk at Legato Road and Dixie Hill Road and Ruffin Drive by installing Rectangular Rapid Flashing Beacons, new curb ramps, pedestrian lighting, advanced warning signage, and possible pedestrian refuge.
668. Stringfellow Road/Chantilly Regional Library and Chantilly High SchoolInstall a marked crosswalk, curb ramps, and pedestrian-scale lighting on Stringfellow Road to provide a pedestrian crossing from the entrance of the Chantilly Regional Library to the entrance of Chantilly High School.
669. Route 29 from Legato Road to Piney Ridge Branch RoadConstruct approximately 750 feet of Active Transportation facilities on the north side of Route 29 from Legato Road to Piney Ridge Branch Road.
671. Monument Drive/Monument CourtInstall a marked crosswalk, median pedestrian refuge, curb ramps, and pedestrian-scale lighting on Monument Drive at the Monument Court intersection.
672. Hillside Road/Hall Street and Timber Hollow LaneInstall a marked crosswalk, possible pedestrian refuge or curb extensions, reconstructed curb ramps, and pedestrian-scale lighting on Hillside Road at the Hall Street and Timber Hollow Lane intersection.
697. Old Kene Mill Road/Rolling Valley Park and RideConstruct approximately 40 feet of Active Transportation facilities on the north side of Old Keene Mill Road at the Rolling Valley Park and Ride entrance with a new marked crosswalk and curb ramps.

Please review the list of projects proposed for the Sully District below or view the interactive Active Transportation Project Prioritization Map.Then share your feedback by completing the Active Transportation Project Prioritization Survey by 4:30 p.m. on March 31, 2026.

TAKE SURVEY
 

Project Number and Title

Description

573. Route 29/Trinity Parkway/Centrewood DriveInstall pedestrian safety improvements at the Route 29 intersection with Trinity Parkway and Centrewood Drive. 
574. Pickwick Road from Leland Road to Johnson AvenueConstruct approximately 800 feet of Active Transportation facilities along the west side of Pickwick Road from Leland Road to Johnson Avenue.
579. Route 50/Centerview Drive/Sullyfield CircleUpgrade crosswalk on eastern approach of Route 50 intersection with Centerview Drive and Sullyfield Circle to high-visibility markings, reconstruct curb ramps, improve pedestrian lighting, and evaluate additional crosswalk and pedestrian refuge islands.
580. Route 50 from Lees Corner Road to the existing trail crosswalk west of Galesbury LaneConstruct approximately 1,300 feet of Active Transportation facilities on the north side of Route 50 from Lees Corner Road to the existing bus shelter and trail at the crosswalk that connects to the shopping center entrance west of Galesbury Lane.
582. Route 50/Metrotech Drive/Elmwood StreetImprove Active Transportation facilities at the Route 50 intersection with Metrotech Drive and Elmwood Street including improved pedestrian-scale lighting and potential additional pedestrian refuge islands and crosswalk.
589. Stonecroft Boulevard from Westfields Boulevard to the existing trail crosswalk at Westone PlazaConstruct approximately 500 feet of Active Transportation facilities on the south side of Stonecroft Boulevard from Westfields Boulevard to the existing trail crosswalk at Westone Plaza.
590. Westvields Boulevard from Stonecroft Boulevard to Smithwood Drive and Sequioa Farms DriveConstruct approximately 1,400 feet of Active Transportation facilities on the west side of Westfields Boulevard from Stonecroft Boulevard to Smithwood Drive and Sequoia Farms Drive.
593. EDS Drive from McLearen Road to the existing sidewalk west of the Air and Space Museum ParkwayConstruct approximately 1,200 feet of Active Transportation facilities along the north/west side of EDS Drive from Mclearen Road to the existing sidewalk west of the Air and Space Museum Parkway intersection.
595. Metrotech Drive from Route 50 to the Sully Place shopping centerConstruct approximately 300 feet of Active Transportation facilities on the east side of Metrotech Drive from Route 50 to the Sully Place shopping center entrance.
605. Fair Ridge Drive from Route 50 north to the existing trail at the rear entrance to the Fair Oaks Fire StationConstruct approximately 750 feet of Active Transportation facilities on the west side of Fair Ridge Drive from Route 50 north to the existing trail at the rear entrance to the Fair Oaks Fire Station.
676. Centrewood Drive/Saint Germain DriveImprove pedestrian crossings at the Centrewood Drive and Saint Germain Drive intersection by upgrading existing crosswalks to high-visibility markings, reconstructing curb ramps, and adding lighting.
678. Route 29/Trinity Parkway/Machen RoadImprove pedestrian crossings at the Route 29 intersection with Trinity Parkway and Machen Road by installing high-visibility crosswalk markings, upgraded curb ramps, and lighting, and a marked crosswalk on the western approach.
679. Stonecroft Boulevard/Old Lee RoadImprove pedestrian access to Westfield High School by installing marked crosswalks on the southern and western approaches of the Stonecroft Boulevard and Old Lee Road intersection and upgrading pedestrian-scale lighting at all four curb ramps.
702. Stringfellow Road from Fairfax County Parkway to the trail north of Custom House CourtConstruct 750 feet of Active Transportation facilities on the west side of Stringfellow Road from Fairfax County Parkway to the trail north of Custom House Court. Install crosswalks and curb ramps at Coralberry Drive and Custom House Court intersections.

PROJECT PRIORITIZATION METHODOLOGY

FCDOT regularly receives requests for unfunded active transportation (e.g. biking, walking and rolling) infrastructure improvements from county residents and communities. These requests are combined with unfunded project recommendations from various traffic studies on an unfunded active transportation project list. The following process is used to prioritize these potential projects to inform decisions as funding is identified.

REQUEST A PROJECT

To request a bicycle or pedestrian improvement – such as a sidewalk, crosswalk, ADA pedestrian ramp, etc. – please contact our FCDOT team by using the link below. Be sure to include:

  • The location where you would like to see an improvement
  • The kind of improvement you are requesting
  • A description of the current conditions and desired outcome of the project