These are the Braddock District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1,2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Carrleigh Parkway - Donset Dr | Add new marked crosswalk and pedestrian refuge island crossing Carrleigh Parkway. | $375,000 | Round 3 |
Grantham St- Victoria Rd to Cromwell Dr | Construct approximately 270 linear feet of missing active-transportation link on the west side. | $875,000 | Round 3 |
Guinea Rd and Bronte Dr | Install refuge with lane narrowing, marked crosswalks on east and west sides and relocate bus stop (school bus) | Round 1 | |
Guinea Rd - Lakepointe Dr | Add Rectangular Rapid Flashing Beacon (RRFB) | Round 2 | |
Guinea Rd - Pierrpont St | Relocate existing marked crosswalk to south leg. Install pedestrian refuge island, curb ramps, and sidewalk connections to relocated bus stops. Study potential RRFB. | Round 2 | |
Guinea Rd - Rutherford Pk | Install curb ramps, curb extension, and RRFB | Round 1 | |
Lake Braddock Dr - Raintree Rd | Upgrade existing crosswalk with pedestrian refuge island and curb ramps. | $320,000 | Round 3 |
Olley Lane - Eastwood Ct | Upgrade existing crosswalk with pedestrian refuge island and/or RRFB. | $500,000 | Round 3 |
Heritage Dr - Commons Dr | Add pedestrian refuge island at existing marked crosswalk. | $350,000 | Round 2 |
Heritage Dr - Rectory Lane | Add pedestrian refuge island at existing marked crosswalk. | Round 2 | |
Rolling Rd - Grigsby Dr |
Relocate existing marked crosswalk to south leg. Add curb extensions, pedestrian refuge island and sidewalk connection to West Springfield High School. Analyze possible pedestrian signal. |
$850,000 | Round 2 |
These are the Dranesville District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1,2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Beverly Rd -Old Dominion Dr | Construct 50 linear feet of 10-foot-wide asphalt path along Beverly Road including a curb ramp at Old Dominion Drive. Project supplements proffer funding. | $75,000 | Round 2 |
Birch Rd from Birch Grove Ct - Kirby Rd |
Construct approximately 470 linear feet of missing active-transportation link on east or west side. Funding for preliminary engineering and partial funding for land acquisition and utilities. |
$800,000 | Round 3 |
Elm St - Old Dominion Dr | Install 25 linear feet of sidewalk with curb ramps and new crosswalk crossing Elm Street near Chain Bridge Road to create a continuous pedestrian facility on Elm Street. Project supplements proffer funding. | $225,000 | Round 2 |
Georgetown Pike - Walker Rd | Add signalized crosswalks on east and north legs of intersection. | $775,000 |
Round 3 |
Georgetown Pike - Great Falls Library | Install refuge and ramps near Bucks Lane on the west side of Tex-Mex driveway. | Round 1 | |
Haycock Rd -Casemont Dr | Add curb extension and curb ramps with new marked crosswalk. Project identified in West Falls Church Metrorail Area Active Transportation Study. | $375,000 | Round 2 |
Idylwood Rd - Montview Ct | Add pedestrian refuge island and possible curb extension at existing marked crosswalk. Project identified in West Falls Church Metrorail Area Active Transportation Study. | $375,000 | Round 2 |
Redd Rd - Idylwood Rd | Crosswalk across Redd Road at Idylwood Road. Improve visibility by regrading embankment on corner of Idylwood Road and Redd Road. Project identified in West Falls Church Metrorail Area Active Transportation Study. | $800,000 | Round 2 |
Westmoreland St - Rosewood Dr | Install refuge and RRFB, relocate bus stop. | Round 1 | |
Leesburg Pike -Shreve Rd-Haycock Rd | Improve existing signalized crosswalks by reducing crossing distance at Shreve Rd and Haycock Rd by removing the additional southbound through lane on Haycock Rd. and reducing Shreve Rd to one lane at intersection - WFC Developer $500k for project. | $700,000 | Round 3 |
Magarity Rd and Kennedy Dr/Lunceford Lane | Add pedestrian refuge island and relocate bus stops at existing marked crosswalk. | Round 2 |
These are the Franconia District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1,2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Buckman Rd from Martha Washington St/Martha St to Bianca Pl | Construct approximately 130 feet of missing active-transportation link on the south side. Add new marked crosswalks crossing Buckman and Martha Street. | $850,000 | Round 3 |
Cumberland Road from Amherst Ave to Backlick Rd | Construct approximately 220 feet of missing active-transportation link on north side | $700,000 | Round 3 |
Kingstown Village Parkway and Cross Gate Lane | Install refuge and relocate bus stop. | Round 1 | |
Kingstown Village Parkway and Park Village Dr | Install refuge and relocate bus stop. | Round 1 | |
Lockheed Blvd from Hybla Valley Elementary School to Huntley Meadows Park |
Active transportation facilities of approximately 1,500 linear ft from Hybla Valley Elem School to Huntley Meadows entrance on south side of Lockheed Blvd & approximately 350 linear feet on west side of Harrison Ln from Bedrock Rd to Lockheed Blvd/Huntley Meadows Park- Aug. 2, 2022, Board Matter |
$5,200,000 | Round 2 |
Safe Routes to School Funding Match | $200,000 (local cash match) which is required to accept $800,000 from VDOT Transportation Alternatives Program (TAP) for Bush Hill Elementary School Safe Routes to School (SRTS) | $200,000 | Round 1 |
North Kings Highway at Mount Eagle Elementary School |
Consolidate two crosswalks across North Kings Highway at Mount Eagle Elementary School to one crossing with a Pedestrian Hybrid Beacon. |
$1,000,000 | Round 3 |
These are the Hunter Mill District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1, 2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Beulah Rd - Abbotsford Dr | Add pedestrian refuge island at existing marked crosswalk. | Round 2 | |
Bluemont Way-Explorer St | Install refuge and ramps and possible RRFB. | Round 1 | |
Bluemont Way -Library St | Relocate existing marked crosswalk to east leg. Add pedestrian refuge island and curb ramps. | Round 2 | |
Frying Pan Rd -Greg Roy Lane/Dakota Lakes Dr | Upgrade existing marked crosswalk with pedestrian refuge island and/or RRFB. | $700,000 | Round 3 |
Glade Dr - Charterhouse Cir | Upgrade existing marked crosswalk with pedestrian refuge island and/or curb extension(s) | $450,000 | Round 3 |
Green Range Dr - Pyrenees Ct/Dogwood Pool | Install ramps and marked crosswalk. | Round 1 | |
Sunset Hills Rd - Reston Station Blvd | Install curb ramps and marked crosswalk. | Round 2 | |
Vale Rd - Flint Hill Rd | Shift existing marked crosswalk, add pedestrian refuge island and study potential RRFB. | $500,000 | Round 2 |
Colts Neck Rd from Reston Parkway to Jackstay Ter | Study for approximately 2,400 linear of trail along Colts Neck Road from Reston Parkway to approximately 200 feet south of Jackstay Terrace. | $150,000 | Round 3 |
Lawyers Rd -Blue Spruce Rd |
Add new marked crosswalk with pedestrian refuge island, curb ramps. Possible curb extension or channelized right-turn island. |
$650,000 | Round 3 |
These are the Mason District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1, 2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Heritage Dr- Commons Dr | Add pedestrian refuge island at existing marked crosswalk. | $350,000 | Round 2 |
Heritage Dr -Rectory Lane | Add pedestrian refuge island at existing marked crosswalk. |
Round 2 | |
Braddock Rd and Witch Hazel Rd | Install refuge with truncated domes. | Round 1 | |
Columbia Pike - Tyler St | Add Pedestrian Hybrid Beacon (PHB) at existing marked crosswalk. Consider RRFB with pedestrian refuge island, if PHB is not feasible or warranted. | $920,000 | Round 2 |
Columbia Pk from Blair Rd to Gordon St | Construct approximately 300 linear feet of missing active-transportation link on north side. | $900,000 | Round 3 |
Leesburg Pike From Seminary Rd to Carlin Springs Rd | Construct approximately 150 linear feet of missing active-transportation link path link on south side. | $725,000 | Round 3 |
Murray Ln and Early St | Install marked crosswalk and ramps. | Round 1 | |
Patrick Henry Dr and Patrick Henry Dr |
Add new marked crosswalk with pedestrian refuge island and bus stop relocation(s). |
$500,000 | Round 3 |
Route 7 Sidewalk from Magnolia Ave across 5930 Leesburg Pike | Add sidewalk on westbound side of Route 7 across Liberty Gas station frontage to existing sidewalk at shopping center to the south. |
$1,900,000 | Round 2 |
These are the Mount Vernon District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1, 2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
North Kings Highway at Mount Eagle Elementary School |
Consolidate two crosswalks across North Kings Highway at Mount Eagle Elementary School to one crossing with a Pedestrian Hybrid Beacon. |
$1,000,000 | Round 3 |
Fort Hunt Rd - Westgrove Rd/Rollins Dr | Upgrade crosswalk with Rectangular Rapid-Flashing Beacons | $100,000 |
Round 3 |
Fort Hunt Rd from Belle Haven Country Club | Entrance to Woodmont Road N/A Widen pavement to add climbing (uphill) bike lane for approximately 850 linear feet. Project will create a bicycle lane connection from Richmond Highway to Belle View Boulevard. | $500,000 | Round 3 |
Gum Springs Trail | Park Authority project to extend the trail adjacent to the playground at Martin Luther King, Jr. Park to Little Hunting Creek. Project requested in August 2, 2022, Board Matter. | $600,000 |
Round 2 |
Hooes Rd and Dudley Dr/Laurel Cress Dr | Install new crosswalk and ramps. | Round 1 | |
Huntington Ave - Fenwick Dr | Additional funding to add missing signalized crosswalk on west leg. | $45,000 | Round 3 |
Huntington Avenue and Fenwick Dr Crosswalk Improvements | Add signalized crosswalk on west leg with curb ramps, pushbuttons, and pedestrian signal heads. Project identified in Huntington Metrorail Area Active Transportation Study. | $375,000 | Round 2 |
Huntington Ave at Robinson Way Crosswalk Improvements | Relocate existing marked crosswalk west of Robinson Way to Robinson Way. Add pedestrian refuge island, RRFB, and pedestrian connection to Huntington Avenue Service Road. Project identified in Huntington Metrorail Area Active Transportation Study. | $700,000 |
Round 2 |
Mount Vernon Highway and Battersea Lane | Upgrade existing crosswalk with pedestrian refuge islands and possible curb extension(s) | $325,000 | Round 3 |
Newington Rd between Telegraph Rd and Ona Dr | Construct 2,200 LF of missing active-transportation link on the north side of Newington Road. Funding for preliminary engineering | $750,000 | Round 3 |
Hooes Rd - South Run Stream Valley Trail |
Install RRFB |
Round 1 |
These are the Providence District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1, 2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Leesburg Pike Shreve Rd/Haycock Rd | Improve existing signalized crosswalks by reducing crossing distance at Shreve Road and Haycock Road by removing the additional southbound through lane on Haycock Rd. and reducing Shreve Rd to one lane at intersection - WFC Developer $500k for project. | $700,000 |
Round 3 |
Magarity Rd and2 Kennedy Dr/Lunceford Ln | Add pedestrian refuge island and relocate bus stops at existing marked crosswalk. | Round 2 | |
Blake Lane and Bel Glade St | Relocate existing marked crosswalk to south leg, add refuge in existing median, install RRFB, and potentially relocate bus stops. | $500,000 | Round 2 |
Blake Lane and Bushman Dr | Install refuge, RRFB, channelized right and crosswalks. | Round 1 | |
Eskridge Rd - Strawberry Ln to Merrifield Town Center Dr. | Study to "Road Diet" Eskridge Road with signage and striping changes that reduce vehicular lane(s) and add bicycle lanes. Study may include potential to expand project limits, depending on traffic analysis. | $50,000 | Round 3 |
Eskridge Road and District Avenue | Relocate existing marked crosswalk to south side. Add pedestrian refuge island and/or RRFB. | $300,000 | Round 2 |
Eskridge Road and Merrifield Cinema Drive | Shift existing marked crosswalk and add pedestrian refuge island. | $200,000 | Round 2 |
Graham Road and Rosemary Lane | Add pedestrian refuge island at existing marked crosswalk. | Round 2 | |
Prosperity Avenue and Halstead II Lane | Upgrade existing crosswalk with Rectangular Rapid-Flashing Beacons. | $350,000 | Round 3 |
Route 29, East of Nutley Street | Construct approximately 150 linear feet of missing active-transportation link on north side. | $650,000 | Round 3 |
Westpark Drive from International Drive to Existing Sidewalk |
Construct approximately 200 linear feet of missing active-transportation link on north side. |
$850,000 | Round 3 |
Woodburn Road and Pine Ridge Park Entrance | Install refuge. | $350,000 | Round 1 |
These are the Springfield District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1 ,2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Hooes Rd and South Run Stream Valley Trail | Install RRFB | Round 1 | |
Fair Lakes Blvd and Sedghurst Dr | Shift existing marked crosswalk, add pedestrian refuge island and study potential RRFB | $500,000 | Round 2 |
Gambrill Rd from Gambrill Woods Way to Kings Ridge Ct | Construct approximately 200 linear feet of missing active-transportation link on east side. Add new marked crosswalk crossing Gambrill Road at Gambrill Woods Way. | $1,250,000 | Round 3 |
Monument Dr and Monument Ct | Add new marked crosswalk with pedestrian refuge island and curb ramps. | $500,000 | Round 3 |
Silverbrook Rd and Crosspointe Dr | Install refuge, ramps and RRFB | Round 1 | |
Sydenstricker Rd and Arley Dr | Add pedestrian refuge island, improve curb ramps and relocate bus stops at existing marked crosswalk. | Round 1 | |
Tuttle Road Tr Connection to Hillside Rd | Preliminary design only. Install approximately 1,100 linear feet of trail connecting Tuttle Road sidewalk south of Garden Road to Hillside Road with marked crosswalk crossing Hillside Road. | $350,000 | Round 2 |
Stringfellow Rd and Greenbriar Park/Big Rocky Run Tr | Upgrade existing crosswalk with Pedestrian Hybrid Beacon. | $1,000,000 | Round 3 |
These are the Sully District bicycle, pedestrian and maintenance projects that are funded to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors on November 1, 2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Stringfellow Road and Greenbriar Park/Big Rocky Run Trail | Upgrade existing crosswalk with Pedestrian Hybrid Beacon. |
$1,000,000 | Round 3 |
Braddock Rd from Newton Patent Dri to Cedar Break Dr | Construct approximately 900 linear feet of missing active-transportation link on north side, including bridge over Big Rocky Run. Funding for preliminary engineering. | $800,000 | Round 3 |
Centreville Farms Rd and Calamint Court/Twilight Glow Dr | Add pedestrian refuge island at existing marked crosswalk. | Round 2 | |
Leland Road and Sammie Kay Lane | Add pedestrian refuge island at existing marked crosswalk. | Round 2 | |
Poplar Tree Road and Walney Road | Construct missing active-transportation links and add missing signalized crossings on north, west, and south legs. | $850,000 | Round 3 |
Saint Germain Drive and Machen Road | Upgrade existing signalized crosswalks to accessible curb ramps and high-visibility crosswalk markings. Possible signal modifications and additional improvements. | $750,000 | Round 2 |
Stone Heather Drive and Franklin Farm Shopping Center | Install marked crosswalk and ramps. |
Round 1 | |
Stringfellow Road and Foxfield Pool | Install refuge with truncated domes. | Round 1 | |
Westfields Boulevard and Walney Road |
Add signalized crosswalk with ramps, pushbuttons and pedestrian signal heads on north leg and possibly south leg. Add pedestrian connection to sidewalk and shared-use path from signalized crossing(s). |
Round 2 |
These are the Countywide funds allocated to date as part of the $100 million the Board of Supervisors designated for active transportation projects.
Round 1–Approved by the Board of Supervisors onNovember1,2022
Round 2–Approved by the Board of Supervisors on April 11, 2023
Round 3–Approved by the Board of Supervisors on December 5, 2023
Project |
Description |
Total Estimate |
Approved |
Add new marked crosswalk and pedestrian refuge island crossing Carrleigh Parkway. | $375,000 | Round 3 | |
Grantham St- Victoria Rd to Cromwell Dr | Construct approximately 270 linear feet of missing active-transportation link on the west side. | $875,000 | Round 3 |
Guinea Rd and Bronte Dr | Install refuge with lane narrowing, marked crosswalks on east and west sides and relocate bus stop (school bus) | $350,000 | Round 1 |
Guinea Rd - Lakepointe Dr | Add Rectangular Rapid Flashing Beacon (RRFB) | $350,000 | Round 2 |
Guinea Rd - Pierrpont St | Relocate existing marked crosswalk to south leg. Install pedestrian refuge island, curb ramps, and sidewalk connections to relocated bus stops. Study potential RRFB. | $350,000 | Round 2 |
Guinea Rd - Rutherford Pk | Install curb ramps, curb extension, and RRFB | $350,000 | Round 1 |
Lake Braddock Dr - Raintree Rd | Upgrade existing crosswalk with pedestrian refuge island and curb ramps. | $320,000 | Round 3 |
Olley Lane - Eastwood Ct | Upgrade existing crosswalk with pedestrian refuge island and/or RRFB. | $500,000 | Round 3 |
Heritage Dr - Commons Dr | Add pedestrian refuge island at existing marked crosswalk. | $350,000 | Round 2 |
Heritage Dr - Rectory Lane | Add pedestrian refuge island at existing marked crosswalk. | $350,000 | Round 2 |
Rolling Rd - Grigsby Dr |
Relocate existing marked crosswalk to south leg. Add curb extensions, pedestrian refuge island and sidewalk connection to West Springfield High School. Analyze possible pedestrian signal. |
$850,000 | Round 2 |