Project Description
The scope of this project is to install approximately 1,400 LF, 5-foot-wide, concrete sidewalk, and 4-foot-wide buffer strip, 495 LF, 6-foot-wide, concrete sidewalk (includes 225 LF curb-abutted concrete sidewalk), 4 curb ramps, 6 driveway entrances, 95 LF guardrail, 495 LF retaining wall & railing, new headwall at the double-cell existing culvert, repairs to existing twin box culvert, removing and resetting a bus shelter, along with other improvements.
