Project No. – 1400102-2013
State Project No. – 0828-029-248, VDOT UPC No. – 107439
Project Engineer – Samuel Engida
Contractor – Allan Myers VA, Inc.
Location – Hunter Mill District
Scope - Construction of a new 16’ wide bicycle/pedestrian overpass spanning approximately 143 LF over Wiehle Avenue to replace the existing at-grade crossing, approximately 175 LF gravity retaining wall, 1,100 LF Mechanically Stabilized Earth (MSE) retaining wall, approximately 2,200 LF, 10 FT and 12 FT wide asphalt trail, concrete sidewalk, curb and combination curb and gutter, curb ramps, detectable warning surfaces, storm drains, storm drain structures, water main relocation, signal works at the intersection of Wiehle Avenue and Sunset Hills Road, signage works, milling, paving, pavement marking and other associated works.