Transportation

CONTACT INFORMATION: Our office is open 8:00 AM-4:30 PM M-F
703-877-5600 TTY 711
4050 Legato Road, Suite 400
Fairfax, VA 22033
Gregg Steverson
Acting Director

Fairfax County Announces 2023 Paving and Restriping Proposals

Virtual Community Meetings Set Throughout April

For Immediate Release
April 7, 2023

The Fairfax County Department of Transportation (FCDOT) will hold a series of online meetings to discuss proposals for the 2023 Paving and Restriping Program starting April 17 and concluding April 26, 2023. Meetings cover proposed bike lane installations and crosswalk improvements that are generally district-specific, with some neighboring districts combining meeting dates. 

As part of the Virginia Department of Transportation’s (VDOT) annual repaving program, FCDOT and VDOT work together to identify transportation infrastructure improvements to increase driver, bicyclist and pedestrian safety. Bike lanes might be standard or buffered depending on space available. Types of crosswalk improvements include marked crosswalks, high-visibility crosswalks and/or crosswalk signage.

Staff from both agencies will present proposed changes, answer questions and accept feedback at the meetings. Meetings also will be recorded and available to watch after the event. The deadline for public comment will be two weeks after the meeting date. Feedback links for online comments are available on each meeting Web page below; or residents may call FCDOT at 703-877-5600, TTY 711.

Attend the Virtual Community Meetings and Provide Feedback
Date District Meeting Resources Proposals
April 17,
7 p.m.

Hunter Mill and Providence
 

Join Online
Dial In: 571-429-5982
Phone Conf ID: 893 826 247#

Hunter Mill Bike Lanes for Glade Drive between Sunrise Valley Drive and Reston Parkway

Monroe Street and Monroe Manor Drive Crosswalk Improvements (Hunter Mill)

Willow Oaks Corporate Drive and Professional Center Access Road Crosswalk Improvements (Providence)

Bikes Lanes in Providence District on:

  • Executive Park Avenue between the Red Cross Building and Prosperity Avenue
  • Gatehouse Road between Williams Drive and Telestar Court
  • Williams Drive between Eskridge Road and Arlington Boulevard and potentially between Arlington Boulevard and Pennell Street
  • Willow Oaks Corporate Drive between Williams Drive and Gallows Road
 

Sully

Join Online
Dial In: 571-429-5982
Phone Conf ID: 610 801 213#

Bike Lanes on Metrotech Drive between Centreville Road and Route 50

Crosswalk Improvements at:

  • Metrotech Drive and Lightfoot Street
  • Elmwood Street and Rockland Village Road
April 19,
7 p.m.

Franconia and Mount Vernon

Join Online
Dial In: 571-429-5982
Phone Conf ID: 468 495 806#

Bike Lanes on Fort Hunt Road between Richmond Highway and Bell View Boulevard (Mount Vernon District)

Franconia District Crosswalk Improvements at:

  • Beverly Park Drive and Hooes Road
  • Beverly Park Drive and Lavender Drive
April 20,
7 p.m.

Braddock and Mason
 
Join Online
Dial In: 571-429-5982
Phone Conf ID: 567 290 14#   

Bikes Lanes on John Marr Drive between Backlick Road and Columbia Pike (Mason District)

Braddock District Bike Lanes on Guinea Road between Braddock Road and Twinbrook Road

Crosswalk Improvements at Southampton Drive and Thames Street (Braddock District)

April 26,
7 p.m.
Springfield  Join Online
Dial In: 571-429-5982
Phone Conf ID: 353 021 956# 
Crosswalk Improvements at Shiplett Boulevard and Capella Avenue

Further details regarding specific proposals, please click on the district-specific Web pages (linked above) or visit the 2023 Fairfax County Paving and Restriping Program page.

###

Fairfax Virtual Assistant