Transportation

CONTACT INFORMATION: Our office is open 8:00 AM-4:30 PM M-F
703-877-5600 TTY 711
4050 Legato Road, Suite 400
Fairfax, VA 22033
Gregg Steverson
Acting Director

Franconia District and Mount Vernon District Paving and Restriping 2023

Virtual Public Meeting Held April 19; Comments Closed May 3, 2023

The Virginia Department of Transportation (VDOT) and the Fairfax County Department of Transportation (FCDOT) held a virtual public meeting on proposed paving and restriping changes in the Franconia and Mount Vernon Districts on April 19, 2023

In Mount Vernon District, FCDOT and VDOT are proposing to add buffered or standard bike lanes on Fort Hunt Road between Richmond Highway and Belle View Boulevard where space allows by narrowing travel lanes or repurposing underutilized parking lanes where feasible.

In Franconia District, FCDOT and VDOT are considering upgrades to the following crosswalk locations, which may include marked crosswalks, high-visibility crosswalks and/or crosswalk signage: 

  • Beverly Park Drive and Hooes Road
  • Beverly Park Drive and Lavender Drive

The comment deadline for these proposals was May 3, 2023.

Please Note:

  • Road maintenance-related comments (e.g., drainage issues, missing signage, signal repair, walkway repair and sight distance issues due to vegetation overgrowth) should be submitted through the myVDOT portal: https://my.vdot.virginia.gov/. If you would like to request road repairs, please follow the "I need a road repaired" link on the VDOT portal or call 1-800-FOR-ROAD (1-800-367-7623).
  • Striping-related comments (e.g., marked parking lanes, crosswalks, and/or sight distance issues due to parked vehicles) can be submitted electronically to FCDOT by using the feedback form link in the red box at the bottom of this page.

Background

Paving and Restriping ProjectAs part of its annual maintenance, VDOT repaves hundreds of roads in Fairfax County each year. FCDOT and VDOT collaborate during the repaving and restriping process to efficiently implement the Fairfax County Comprehensive Plan that seeks to improve traffic safety and provide transportation options to people around the County.

In general, paving work is scheduled to begin in April and conclude in November, however, the Ellenwood Drive project may begin sooner to take advantage of warmer winter weather. Exact work dates are available about ten days prior to work beginning, as contractors set schedules based on personnel and equipment availability. In subdivisions, "no parking" signs with precise date information will be posted at least three business days prior to work starting. Residents can expect work vehicles in their neighborhood during the project. Motorists are asked to be alert to temporary traffic patterns. Cars, basketball hoops or garbage cans may need to be temporarily relocated while work is under way. Work hours are usually limited to outside of rush hours. Crews typically work on neighborhood streets weekdays from 9 a.m. to 3 p.m. On other roads such as interstates and some primaries, work may occur overnight.

Return to the FCDOT Paving and Restriping Program landing page.

FCDOT ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format or would like to request reasonable accommodations for persons with disabilities or limited English proficiency, contact FCDOT at 703-877-5600, TTY 711. Requests for assistance must be received at least 7 business days in advance of an event.

Franconia and Mount Vernon Paving and Restriping Feedback

 

Submit questions and comments on the Paving and Restriping Proposals:


Fairfax Virtual Assistant