Columbia Pike Complete Streets Phase I from Backlick Road to Tom Davis Drive

Public Meeting Held Jan. 23; Comments Due Feb. 10, 2023

Supervisor Penny Gross and FCDOT hosted a virtual community meeting to present preliminary plans, answer questions and take feedback on the Columbia Pike Complete Streets Phase I Project on Jan. 23. Comments are due Friday, Feb. 10. Please use the link in the red Feedback box below to email the project team. Written comments can be mailed to:

FCDOT - Columbia Pike Complete Streets Project
4050 Legato Road, Suite 400
Fairfax, VA 22033

Project Description  

Columbia Pike Complete Streets Phase I MapThis project will construct a new 6-foot-wide sidewalk, ADA compliant curb ramps and a 6-foot-wide landscape panel along the south side of Columbia Pike from Backlick Road to Tom Davis Drive. Streetscape elements will be implemented based on feasibility and funding availability. A new high visibility crosswalk is proposed for installation at Tom Davis Drive to connect the new sidewalk to the existing pedestrian facilities on the north side of Columbia Pike. Construction of the proposed improvements will require right-of-way acquisition and utility relocations.

Project Background 

The Columbia Pike Complete Streets Phase I Project is located in Annandale’s Central Business and Community Revitalization Overlay District. The project was created as a result of the Columbia Pike Pedestrian and Bicycle Study (May 2018), which indicated the need for updating pedestrian and bicycle access along the corridor. The project will complete a missing sidewalk gap and provide connectivity between commercial areas on the north and south sides of Columbia Pike within the project limits. 

Questions? Comments?

Contact the project team.