Herndon Monroe P&R Fairfax Connector Service Temporarily Relocated Due to Bus Loop Construction

Beginning September 23 through November 2019, Fairfax Connector bus service at the Herndon Monroe Park and Ride will be relocated to a temporary stop on Sunrise Valley Drive.

Herndon Monroe P&R Fairfax Connector Service Temporarily Relocated Due to Bus Loop Construction


Stop ID #4041 for Routes 401 & 402 Will be Missed Due to Construction at Inova Fairfax Medical Campus

Due to a temporary detour, bus stop ID #4041 will not be served from 6 p.m. Friday, Aug. 9, through Sunday, Aug. 11. Please use the temporary bus stop, which includes overhead shelter and seating, located on Wilmot Way near Woodburn Road for boarding and exiting your bus.


Fairfax Connector Bus Service at Huntington Metrorail Station Temporarily Moved

Three Fairfax Connector bus routes at the Huntington Metrorail Station are temporarily moved due to ongoing construction:

Route 101 – Change at Huntington Metrorail Station
Beginning Thursday, 6/13/2019, Route 101 eastbound will pick-up and drop-off at Huntington North bus bay C until further notice due to ongoing construction.

Route 310 – Changes at Huntington Metrorail Station
Due to overnight closure of Huntington Metrorail Station North bus loop from 6/10-6/29/2019, Route 310 passengers should board on westbound Huntington Avenue at Metroview Pkwy (Bust stop ID# 2425) between the hours of midnight and 4 a.m.

Route 171 – Changes at Huntington Metrorail Station
Due to overnight closure of Huntington Metrorail Station North bus loop from 6/10/2019-6/29/2019, Route 171 passengers should board along Huntington Avenue Southbound Bay G/H between the hours of midnight and 4 a.m.
We appreciate the patience of Fairfax Connector passengers.

Fairfax Connector Bus Service at Huntington Metrorail Station Temporarily Moved


Stop ID #3566 for Routes 951 & 551 Will be Missed Due to Construction at Herndon Metrorail Station

Effective May 16, 2019, until further notice

Due to construction activity at the new Herndon Metrorail Station, Routes 951 & 551 will be missing stop ID# 3566 (Sunrise Valley Drive and Thunder Chase Drive) until further notice. Passengers should go to Herndon-Monroe Park and Ride or use bus stop ID# 3528 (Sunrise Valley Drive and Glade Drive) as alternate.


Herndon-Monroe Parking Relocated to New Herndon Garage Beginning April 8, 2019

Work continues on the Herndon-Monroe Park and Ride facilities in preparation for the new Herndon Metrorail Station and the arrival of Silver Line Phase 2 service. With construction of the new garage nearing completion, work now begins on the existing parking garage. Effective on or around April 8, 2019, the existing parking garage will close for a period of months in order to make necessary improvements. All parking will be relocated to the new garage on Levels 1, 2 and 3.

Herndon-Monroe Parking Relocated to New Herndon Garage Beginning April 8, 2019


Bus Stop Notice - Route 574

Due to bus operations related concerns, the timepoints associated with Bus Stops ID# 2657 (Route 7 eastbound) and ID# 2669 (Route 7 westbound) will be removed from the scheduled. Route 574 will still serve these stops but buses may arrive earlier than previously scheduled and will no longer hold at those locations. Passengers boarding Route 574 at other stops along Route 7 may also experience early bus arrivals due to this change. We apologize for the inconvenience.


Route 334 Advisory: Single Route Detour

Effective Jan. 8, 2018, through Fall 2018

To improve connections at the Franconia-Springfield Metro & VRE Station and provide more predictable travel times, Route 334 will operate a single route pattern at all times. Three stops will be missed due to this detour. Bus Stop IDs: 1860, 1862, and 6201.

Route 334 Advisory: Single Route Detour


Routes 321 and 322 Advisory: Bus Stop ID Relocation

Effective Sept. 30, 2017

Bus Stop ID #5162 – Industrial Road @ Commercial Drive - will not be served by Routes 321 and 322 until further notice. Passengers traveling to and from this location can use Bus Stop ID#3859 – Commercial @ E Industrial Road. This stop is located approximately 150 feet north of Industrial Road on the east side of Commercial Drive.

Routes 321 and 322 Advisory: Bus Stop ID Relocation

Completed Advisories

Fairfax Connector Will Operate Sunday Service Memorial Day, Monday, May 27, 2019

Due to the Memorial Day Holiday, Fairfax Connector will be operating Sunday service on Monday, May 27 2019.

  • The following routes operate on a Sunday schedule:

101109151152161162171310, 321, 322, 371401402423463505551558559574605630640650721937950981983RIBS 1RIBS 2RIBS 3RIBS 4 and RIBS 5

Fairfax Connector Will Operate Sunday Service Memorial Day, Monday, May 27, 2019


Stop ID #3597 for Route 950 Will be Missed Due to Construction

Due to construction, there will be no service at bus stop ID #3597 (Town Center Pkwy at Baron Cameron Ave) for about two weeks beginning on May 21. Passengers should use bus stop ID #3596 (Town Center Pkwy near Cameron Glen Dr).


Fairfax Connector Operates Holiday Weekday Service on George Washington's Day Holiday - Monday, Feb. 18

For Immediate Release
February 12, 2019
#C08_19

Fairfax Connector will operate Holiday Weekday Service on George Washington's Day holiday, Monday, Feb. 18, 2019.

Fairfax Connector Operates Holiday Weekday Service on George Washington's Day Holiday - Monday, Feb. 18


Fairfax Connector Operates Holiday Weekday Service on Martin Luther King, Jr. Holiday - Monday, Jan. 21

For Immediate Release
January 16, 2019
#C04_19

Fairfax Connector will operate Holiday Weekday Service on the Martin Luther King, Jr. holiday.

Fairfax Connector Operates Holiday Weekday Service on Martin Luther King, Jr. Holiday - Monday, Jan. 21


Fairfax Connector Schedule for Christmas and New Year Holidays

COMPLETED

For Immediate Release
Dec. 17, 2018
#C42_18

Fairfax Connector announces service during the Christmas Eve, Christmas Day and New Year's Day holidays. On Christmas Eve, Monday, Dec. 24 and New Year's Day, Jan. 1, 2019, Fairfax Connector will operate Holiday Weekday Service.

On Christmas Day, Tuesday, Dec. 25, 2018, Fairfax Connector will operate Sunday Service.

Fairfax Connector Schedule for Christmas and New Year Holidays


Herndon-Monroe Park and Ride Bus Loop Closed December 19

COMPLETED

Herndon-Monroe Park and Ride ClosureDue to overnight construction at the Herndon Monroe Park and Ride, the bus loop will be closed to vehicle and pedestrian traffic from 10 P.M. on December 19 until 4 A.M., December 20, 2018. After 10 P.M. Fairfax Connector buses will pick up and drop off at temporary stops along Sunrise Valley Drive. Follow signs to the temporary locations. The Herndon Monroe parking garage will remain open for parking. Thank you for your patience.


New Traffic Pattern on Recently Opened Backlick Road Bridge Could Cause Delays on Area Routes

For Immediate Release
December 5, 2018
#C41_18

Fairfax Connector Route 334  and other routes that serve the area near the new, recently opened Backlick Road Bridge may experience schedule delays due to a new traffic pattern.

New Traffic Pattern on Recently Opened Backlick Road Bridge Could Cause Delays on Area Routes


For Immediate Release
Dec. 5, 2018
#C40_18

McLean Metrorail Station Bus Stops Temporarily Relocated at Colshire Drive

Due to construction, beginning on or around December 6 and weather permitting, the McLean Metrorail Station bus stops at Colshire Drive will be relocated temporarily. Service will resume at the permanent location when construction is completed in about 60 days.

McLean Metrorail Station Bus Stops Temporarily Relocated at Colshire Drive


Fairfax Connector Schedule for Thanksgiving Holidays - Nov. 22 -23, 2018

COMPLETE

For Immediate Release
Nov. 19, 2018
#C38_18

Over the Thanksgiving Holidays, Fairfax Connector will operate "Sunday Service" on Thursday, Nov. 22 and  "Holiday Weekday Service" on Friday, Nov. 23, 2018.

Fairfax Connector Schedule for Thanksgiving Holidays - Nov. 22 -23, 2018


Fairfax Connector is Operating Regular Service on Thursday, Nov. 15

COMPLETE

FOR IMMEDIATE RELEASE
Nov. 15, 2018
#C38_18

A wintry mix is falling over the region today. This is a reminder that Fairfax Connector is operating regular service on Thursday, Nov. 15, 2018.

Fairfax Connector is Operating Regular Service on Thursday, Nov. 15


Bus Stop Notice - Route 574

Due to bus operations related concerns, the timepoints associated with Bus Stops ID# 2657 (Route 7 eastbound) and ID# 2669 (Route 7 westbound) will be removed from the scheduled. Route 574 will still serve these stops but buses may arrive earlier than previously scheduled and will no longer hold at those locations. Passengers boarding Route 574 at other stops along Route 7 may also experience early bus arrivals due to this change. We apologize for the inconvenience.


Fairfax Connector Schedule for Veterans Day Observance - Monday, November 12, 2018

COMPLETE

For Immediate Release
Nov. 1, 2018
#C35_18

Due to the Veterans Day Holiday Observance, Fairfax Connector will be operating Holiday Weekday Service on Monday, Nov. 12, 2018. 

All routes operate regular weekday service except:

Route 980 will run every 12-15 minutes instead of every 6-8 minutes.

Fairfax Connector Schedule for Veterans Day Observance - Monday, November 12, 2018


Fairfax Connector Detours for South Lakes High School Homecoming Parade, Friday, October 26, 2018

CANCELLED

For Immediate Release
October 25, 2018
#033_18

Due to the South Lakes High School Homecoming Parade on Friday, Oct. 24, 2018, from 5 to 6 p.m., RIBS 3 and Route 551 Eastbound will follow planned detours.

South Lakes High School Homecoming Parade Detours and Missed Stops


Town of Vienna Halloween Parade October 24, 2018

COMPLETE

For Immediate Release
October 22, 2018
#032_18

Due to the Town of Vienna Halloween Parade on Wednesday, Oct. 24, 2018, Fairfax Connector buses 461 and 463 (Eastbound and Westbound) will detour from 6:30 to 9:30 p.m.

Town of Vienna Halloween Parade Detours and Missed Stops


Herndon-Monroe Partial Bus Loop Closure October 29, 2018

COMPLETED

For Immediate Release
October 22, 2018
#031_18

Due to the installation of a new stair tower, the Herndon-Monroe bus loop will be closed from 10 a.m. to 3 p.m., weekdays. Fairfax Connector and Metrobus will use bays closer to the garage under construction or the temporary bus stop at the entrance to the park and ride facility on Sunrise Valley Drive. All service and bus stop locations before 10 a.m. and after 3 p.m. will not be affected. Work is expected to take place through January 2018.

Herndon-Monroe Garage Bus Loop Closure


Herndon-Monroe Garage Re-striping Work

Portions of the Herndon-Monroe Garage will be closed beginning October 1. Pavement re-striping will be occurring in multiple locations and drive lanes and parking spaces will be re-striped in a new configuration. Accessible parking spaces will be relocated to new areas on the first floor.

To ensure the safety of commuters who are ridesharing, including carpooling and slugging, pick up and drop-off areas have been relocated.

Herndon-Monroe Garage Re-striping Work


Fairfax Connector Columbus Day Schedule

COMPLETE

Due to the Columbus Day Holiday, Fairfax Connector will be operating Holiday Weekday Service on Mon., Oct. 8, 2018.

Fairfax Connector Columbus Day Schedule


Herndon-Monroe Garage Re-striping Work Begins October 1

Pavement restriping will be occurring in multiple locations within the Herndon-Monroe Garage. During this work accessible parking spaces will be relocated to new areas on the first floor. Please be aware of new traffic patterns.

Herndon-Monroe Garage Re-striping Information


Fairfax Connector Routes 605, 621 and 623 Will Not Serve Some Government Center Stops This Weekend

COMPLETE

Due to Fall for Fairfax KidsFest, Fairfax Connector Routes 605, 621, and 623 will not serve this stop starting 9 p.m., Friday, September 28, 2018.

Please use the stops located on Post Forest Drive or Government Center Parkway.

Fairfax Connector Routes 605, 621 and 623 Will Not Serve Some Government Center Stops This Weekend


Temporary Reduction of Spaces at Fairfax County Government Center Park & Ride

COMPLETE

Due to activities related to Fall for Fairfax KidsFest, a section of the Fairfax County Government Center Park & Ride is currently closed.

Approximately 300 parking spaces are available for commuter use in the open section of the Park & Ride lot.

Temporary Reduction of Spaces at Fairfax County Government Center Park & Ride


Fairfax Connector Detours for Herndon High School Homecoming Parade, Saturday, Sept. 22, 2018

COMPLETE

For Immediate Release
September 20, 2018
#026_18

Due to the Herndon High School Homecoming Parade on Saturday, Sept. 22, 2018, from 6 a.m. until approximately 12:30 p.m. (as the parade clears), the following routes will be impacted: 937, 950, and RIBS 5.
 

Fairfax Connector Bus Service to Operate Sunday Schedule on Labor Day - Monday, September 3

COMPLETE

For Immediate Release
August 23, 2018
#020_18

Fairfax Connector will be operating Sunday service on the Labor Day Holiday - Monday, September 3, 2018.
  • The following routes will operate Sunday service:

101, 109, 151, 152, 161, 162, 171, 310, 321, 322, 371, 401, 402, 423, 463, 505, 551, 558, 559, 574, 605, 630, 640, 650, 721, 937, 950, 981, 983, RIBS 1, RIBS 2, RIBS 3, RIBS 4 and RIBS 5

Fairfax Connector Bus Service to Operate Sunday Schedule on Labor Day - Monday, September 3


Service Improvements to Fairfax Connector Routes 699 and 171 Go Into Effect July 28, 2018

COMPLETE

For Immediate Release
July 10, 2018
#017_18

Earlier today, the Fairfax County Board of Supervisors approved service improvements to Fairfax Connector Routes 699 and 171, effective Saturday, July 28, 2018. The changes are based on passenger feedback, and implemented with the goal of improved customer experience through increased on-time performance, service reliability and effectiveness.

Service Improvements to Fairfax Connector Routes 699 and 171 Go Into Effect July 28, 2018


Government Center Park and Ride, Fairfax Connector 699 Express Service Temporary Relocation, and Bus Stop Closures Effective June 4-15, 2018

COMPLETE

For Immediate Release
May 31, 2018
#014_18

Due to the annual Celebrate Fairfax! festival, the Fairfax County Government Center Park and Ride facility and Route 699 express service to downtown D.C. will be temporarily relocated, and the bus stops serving the Government Center will be temporarily closed June 4-15, 2018.

Government Center Park and Ride, Fairfax Connector 699 Express Service Temporary Relocation, and Bus Stop Closures Effective June 4-15, 2018


2018 Herndon Festival Road Closures to Impact Fairfax Connector Service

COMPLETE

For Immediate Release
May 24, 2018
#011_18

Due to multiple road closures in the Town of Herndon related to the Herndon Festival, Fairfax Connector routes serving the Herndon area will be impacted from Thursday, May 31, 2018, through Sunday, June 3, 2018.

2018 Herndon Festival Road Closures to Impact Fairfax Connector Service


Fairfax Connector Bus Access at Spring Hill Metrorail Station Temporarily Moved Starting Monday, May 21, 2018

COMPLETE

For Immediate Release
May 17, 2018
#010_18

Fairfax Connector bus stops along the westbound Route 7 between Spring Hill and Tyco road in Tysons will be moved beginning May 21 for approximately three weeks for Silver Line-related roadwork.

Fairfax Connector Bus Access at Spring Hill Metrorail Station Temporarily Moved Starting Monday, May 21, 2018


Minor Changes to Fairfax Connector Service Go Into Effect May 19, 2018

COMPLETE

For Immediate Release
May 16, 2018
#009_18

Minor changes to Fairfax Connector will go into effect on May 19, 2018. Changes include minor modification to the timetables of Routes 321/322  and RIBS 3 and they will improve efficiency for Fairfax Connector riders.

Minor Changes to Fairfax Connector Service Go Into Effect May 19, 2018


Fairfax Connector Bus Access at McLean Metrorail Station Temporarily Shifting Starting Monday, May 14

COMPLETE

For Immediate Release
May 9, 2018
#006_18

Fairfax Connector and Metrobus stops along the southbound lanes of Route 123/Dolley Madison Boulevard in front of McLean Metrorail Station will be temporarily relocated about 200 feet south on or about May 14 for approximately three weeks for Silver Line-related roadwork and underdrain repairs.

Fairfax Connector Bus Access at McLean Metrorail Station Temporarily Shifting Starting Monday, May 14


Herndon-Monroe Park and Ride Advisory: Sidewalk Closed 
 

COMPLETE

Effective January 18, 2017

The sidewalk adjacent to the old surface lot will be closed until the new garage is completed. Vehicle access will be restricted to one lane into the complex. Pedestrians should use the temporary sidewalk for the duration of the project. Click on the image below to enlarge.