Transportation

CONTACT INFORMATION: Our office is open 8:00 AM-4:30 PM M-F
703-877-5600 TTY 711
4050 Legato Road, Suite 400
Fairfax, VA 22033
Gregg Steverson
Acting Director

2021 Dranesville District Paving and Restriping

News and Updates

Online Community Meeting Held March 25; Comment Period Closed April 8, 2021

The Virginia Department of Transportation (VDOT) and the Fairfax County Department of Transportation (FCDOT) held a virtual public meeting on proposed paving and restriping changes in the Dranesville District on Thursday, March 25, at 7 p.m. Community members had the opportunity to learn about VDOT's repaving program, proposed striping changes and give feedback.

For those unable to attend the event, meeting materials are available:

The comment period for Dranesville District paving and restriping projects closed April 18, 2021.


Please note:

  • Road maintenance related comments (e.g., drainage issues, missing signage, signal repair, walkway repair and sight distance issues due to vegetation overgrowth) should be submitted through the myVDOT portal: https://my.vdot.virginia.gov/. If you would like to request road repairs, please follow the "I need a road repaired" link on the VDOT portal or call 1-800-FOR-ROAD (1-800-367-7623).
  • Unfortunately, no additional roads can be added to the preliminary 2021 paving schedule at this point.
  • Striping-related comments (e.g., marked parking lanes, crosswalks, and/or sight distance issues due to parked vehicles) can be submitted electronically to FCDOT.

Dranesville District Information

North Shore Drive

(North Shore Drive, pictured)

Parcher Avenue from Centreville Road to Maleady Drive: VDOT and FCDOT are proposing to add bike lanes. Existing legal on-street parking will be maintained.

See VDOT's Northern Virginia Paving Program page for more information on road specific projects, status, maps and contact information, which is updated weekly during the paving season.

 

Background

Paving and Restriping ProjectAs part of its annual maintenance, VDOT repaves hundreds of roads in Fairfax County each year. FCDOT and VDOT collaborate during the repaving and restriping process to efficiently implement the Fairfax County Comprehensive Plan that seeks to improve traffic safety and provide transportation options to people around the County.

Paving work is scheduled to begin in April and conclude in November. Exact work dates are available about ten days prior to work beginning, as contractors set schedules based on personnel and equipment availability. In subdivisions, "no parking" signs with precise date information will be posted at least three business days prior to work starting. Residents can expect work vehicles in their neighborhood during the project. Motorists are asked to be alert to temporary traffic patterns. Cars, basketball hoops or garbage cans may need to be temporarily relocated while work is under way. Work hours are usually limited to outside of rush hours. Crews typically work on neighborhood streets weekdays from 9 a.m. to 3 p.m. On other roads such as interstates and some primaries, work may occur overnight.

Return to the FCDOT Paving and Restriping Program landing page.

FCDOT ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format or would like to request reasonable accommodations for persons with disabilities or limited English proficiency, contact FCDOT at 703-877-5600, TTY 711. Requests for assistance must be received at least 7 business days in advance of an event.

Fairfax Virtual Assistant