The project list below has the summaries of capital projects currently under construction.
Public Works and Environmental Services Alert:
The project list below has the summaries of capital projects currently under construction.
Project Name Sort descending | Image | Description | Project Type | District * | Anticipated Completion |
---|---|---|---|---|---|
Accotink Odor Control Facility - Construction Summary | Accotink Odor Control Facility | Wastewater | Mount Vernon District | May 2025 | |
Adult Detention Center – Security Upgrades - Construction Summary | Renovation of existing Adult Detention Center buildings’ including security upgrades and new security control room. | Building | Providence District | Fall 2025 | |
Annual Contract for Bus Stop Construction Services 2022 - Construction Summary | Annual Contract for Bus Stop Construction Services 2022 | Transportation | September 2024 | ||
Annual Contract For Stormwater Improvements - Construction Summary | Annual Contract For Stormwater Improvements | Stormwater | February 2028 | ||
Annual Contract for Stream Restoration - Construction Summary | Annual Contract for Stream Restoration | Stormwater | May 2024 | ||
Annual Contract for Transportation Construction Services $3 Million - Construction Summary | Annual Contract for Transportation Construction Services $3 Million | Transportation | October 2024 | ||
Annual Contract for Transportation Construction Services $500K - Construction Summary | Annual Contract for Transportation Construction Services $500K | Transportation | October 2024 | ||
Chain Bridge Road Gravity Sewer Capacity Improvement - Construction Summary | Downstream gravity sewer capacity improvements need for the Langley School Pump Station and Force Main Replacement project. | Wastewater | Dranesville District | Winter 2024 | |
Colvin Run Phase II at Lake Fairfax Park - Construction Summary | Project consists of the restoration of approximately 4,468 linear along two unnamed tributaries to Colvin Run within Lake Fairfax Park in Fairfax County, Virginia. | Stormwater | Hunter Mill District | March 2025 | |
Coon Branch At Annandale Park Stream Restoration - Construction Summary | This project includes stream restoration using Natural Channel Design techniques of approximately 1,685 LF of Coon Branch and unnamed tributaries of the Coon Branch stream channel and 578 LF sanitary sewer installation, rehab, CCTV and new manhole install | Stormwater | Mason District | November 2024 | |
Courtroom Renovations PH IV and Courtroom 3J - Construction Summary | Courtroom Renovation Phase IV | Building | Providence District | Late Fall 2025 | |
Dead Run Pump Station Valve Replacement - Construction Summary | The project aims to extend the service life of the pump station and prevent unplanned breakdowns by replacing all the suction and discharge valves, adding a new bypass connection, and replacing the steel support for the pump shafts. | Wastewater | May 2024 | ||
Difficult Run Pump Station Grit Mitigation and Odor Control Improvements - Construction Summary | Project addressing grit issues and odor concerns at the Difficult Run Pump Station located at 9950 Colvin Run Road, Great Falls, VA 22060. | Wastewater | Dranesville District | Fall 2024 | |
Difficult Run Tributary At Government Center - Construction Summary | The work will include, but not limited to: grading, excavation, fill, stream alignment, in-stream and log structures, reinforced bed material, riparian corridor enhancement. | Stormwater | Braddock District | November 2024 | |
EMTA Maintenance Facility (0047WP) Pond Improvement Plan - Construction Summary | Project consists of wet dredging an existing wet pond and repairing several stormwater outfalls. | Stormwater | Springfield District | June 2024 | |
Franconia Police Station and Governmental Center, Kingstowne Early Childcare, and Kingstowne Library - Construction Summary | A new Franconia Police Station, Franconia District Supervisor’s Office, and Franconia Museum co-located with a 30,000 SF Kingstowne Regional Library and 8,000 SF Active Adult Center and with the new 10,000 SF Kingstowne Early Childcare Center. | Building | Franconia District | Early 2025 | |
Holmes Run Pump Station Rehabilitation - Construction Summary | Rehabilitation of the Holmes Run Pump Station located at 6623 Dearborn Drive in Falls Church, VA | Wastewater | Mason District | Summer 2024 | |
Indian Run Gravity Sewer Replacement Project - Construction Summary | This project will remove the stream crossing by re-routing sewer segments. A bank stabilization effort to protect sewer assets will also take place. | Wastewater | Mason District | Summer 2024 | |
Magarity Road Walkway Project - Construction Summary | Construction of 2,300 LF of asphalt walkway, 8 feet wide on Magarity Road from Ware Road to Peabody Drive. A retaining wall (92 LF) and 5-foot concrete sidewalk (300 LF) are also required. | Transportation | June 2024 | ||
Monument Drive Commuter Parking Garage and Transit Center - Construction Summary | 820-space parking garage, 8-bus bay transit center with glass and steel canopy over the bus bays, a short-term parking area for pick up and drop off, commuter (slug) lanes, secure bicycle parking and storage, and bicycle racks. | Building | Braddock District | End of 2023 | |
Mount Vernon Terrace Force Main Replacement - Construction Summary | Replacement of a 1,246 LF 6" diameter sanitary sewer force main. | Wastewater | Mount Vernon District | September 2024 | |
Oak Marr Pump Station Rehabilitation Project - Construction Summary | Oak Marr Pump Station Rehabilitation Project | Wastewater | Fall 2024 | ||
Old Courthouse Road at Besley Road Realignment Project | Old Courthouse Road at Besley Road Realignment Project is part of the spot improvement program in the Hunter Mill District of Fairfax County | Transportation | Hunter Mill District | December 2025 | |
Operational Support Bureau - Construction Summary | New 36,600 SF building, 8,000 SF motorcycle building, 3,250 SF vehicle building, and 2,750 SF inspection building. | Building | Mason District | Spring 2025 | |
Primary - Secondary Sustaining Project 1 - Construction Summary | Project will meet short-term rehabilitation needs of primary & secondary facilities at the Noman M. Cole, Jr., Pollution Control Plant. The scope includes 106 elements to improve the safety and operations for the next 15 years. | Wastewater | Mount Vernon District | March 2027 | |
Raw Wastewater Pumping System Rehabilitation/Replacement-B3 - Construction Summary | B3 Rehabilitation consisting of demolition of existing 6” header and wall cleaning system on EQ Tanks No. 1-4, demolition of WWR Pumps and above grade WWR piping in Tanks No. 1-5, replacement ... | Wastewater | Mount Vernon District | Spring 2024 | |
Rehabilitation of the Activated Sludge Effluent Pump Station - Construction Summary | Rehabilitation of the Activated Sludge Effluent (ASE) Pump Station which conveys secondary effluent to the Moving Bed Biological Reactor Facility process. | Wastewater | Mount Vernon District | April 2026 | |
Rocky Branch at Hickory Hollow Lane - Construction Summary | Project consists of the restoration and stabilization of approximately 5,147 linear feet of perennial and intermittent stream, and riparian corridor enhancements for improved water quality. | Stormwater | Providence District | October 2025 | |
Rocky Branch Tributary at Ashlawn Park Stream Restoration - Construction Summary | Rocky Branch Tributary at Ashlawn Park Stream Restoration | Stormwater | Providence District | June 2024 | |
Savile Lane Pumping Station Rehabilitation Project - Construction Summary | Rehabilitation of the Savile Lane Pump Station in McLean, VA. | Wastewater | Dranesville District | November 2024 | |
Seven Corners Fire Station - Construction Summary | Demolition of existing fire station and construction of new approximately 13,500 SF fire station with associated site improvements. The project also includes a storage outbuilding at the rear of the fire station. | Building | Mason District | Late Summer 2024 | |
Slipline Replacement No. 3 (Celadon Lane) - Construction Summary | The project involves the replacement of approximately 1,700 linear feet of defective 6-inch slip-lined sanitary sewer pipes, relocation of approximately 900-linear feet of sewer main from backyards to the street, and re-routing of 13 sewer service lines. | Wastewater | Mason District | Spring 2024 | |
Solids Processing Rehabilitation Phase III - Construction Summary | Rehabilitation of solids-related processes including incineration, sludge storage, ash collection, scum concentration, supporting processes, and supporting facilities. The project also includes rehabilitation of buildings K1 (incineration), K2 (incinerati | Wastewater | Mount Vernon District | Summer 2024 | |
Springfield Community Business Center (CBC) Commuter Parking Garage - Construction Summary | 1100 parking spaces, pedestrian bridge across Old Keene Mill Road, 7 bus bay transit center, open air community use areas at grade and top deck and solar panels to reduce energy consumption. | Building | Franconia District | Summer 2024 | |
Stormwater and Wastewater Consolidation Facility - Construction Summary | This project consolidates Stormwater and Wastewater functions for integrated services, is a showcase and educational facility that exemplifies sustainable features, and includes administrative office building, maintenance and storage buildings. | Building | Braddock District | Fall 2026 | |
Temporary Fairview Fire Station - Construction Summary | Temporary Fire Station and Parking Lot | Building | Springfield District | Summer 2024 | |
Terminal Road Spot Improvement | Terminal Road Spot Improvement is the addition of a left turn lane and channelizing the right turn lane on Terminal Road eastbound approach to Fairfax County Parkway. | Transportation | Mount Vernon District | April 2025 | |
Tucker Avenue Neighborhood Stormwater Improvements - Construction Summary | Project will improve stormwater drainage conditions and infrastructure, reduce localized flooding and erosion, improve water quality, and protect the adjacent Pimmit Run Stream. | Stormwater | Dranesville District | January 2026 | |
Turkeycock Creek at Brookside Office Park - Construction Summary | Approximately 300 linear feet of stream restoration of the Turkeycock in Cameron Run Watershed in the Mason District. | Stormwater | Mason District | Completion – May 2024 | |
Wiehle Avenue at Washington and Old Dominion Trail - Construction Summary | Wiehle Avenue at Washington and Old Dominion Trail | Transportation | Hunter Mill District | July 2024 | |
Wolf Trap Elementary School Safe Routes To School - Construction Summary | Project purpose is to improve Wolf Elementary School's main school crossing across Beulah Road at Talisman Drive and improve safety for modes along Beulah Road near the school. | Transportation | Hunter Mill District | April 2024 |