Lakevale Estates Collection Improvements - Construction Summary
2026-10-08T08:00:00
2026-10-08T08:00:00
Project Number: WW-000032-008
Project Engineer: Lizzy Merin
Scope: The project consists of improvements to the collection system downstream of the Lakevale Estates Pump Station in order to increase capacity to mitigate current and future risk of sewer surcharging. The current project scope includes replacement of the existing gravity sewer, between manhole 037-4-003 (near 2419 Newton Street) and manhole 038-03- 011 (near 9829 Vale Road), with larger diameter pipe using open-cut construction.