Completed Meetings on 2015 Summer Repaving Proposed Bicycle Projects & Projects by District
Franconia Road from South Van Dorn Street to Craft Road. The meeting was held at Edison Highschool from 7:00-8:30 PM.
Kingstowne Village Parkway from Beulah Street to Hayfield Street. The meeting took place at Kingstowne's Thomas Center at 6090 Kingstowne Village Parkway, Alexandria. Please see the below presentation for information that was discussed: An additional public meeting will be held on April 8, 2015 at the same location.
Proposed Street Design Updates-VDOT Summer 2015 Repaving from Fairfax County
Shipplet Boulevard from Burke Lake Road to Old Keene Mill Road AND Burke Road from Burke Lake Road to Rolling Road. The meeting will be held at the West Springfield Community Center, Community Room located at 6140 Rolling Road to discuss adding bike lanes. The meeting is scheduled to begin at 7.
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving-Springfield District from Fairfax County
7:00-9:00 PM. Tysons: Multiple streets and bicycle facilities. There are multiple proposals to improve safety for people who drive, bike, and walk in Tysons. The meeting is being held in the cafeteria at Westbriar Elementary School, 1741 Pine Valley Dr, Vienna, VA 22182. The following list represents the proposals that will be discussed:
- Greensboro Drive: Road Diet from Spring Hill Road to Solutions Drive
- Westbranch Drive: Road Diet from Westpark Drive to Jones Branch Drive
- Jones Branch Drive: Climbing lane towards Westpark Drive for 0.3 mi
- Westwood Center Drive: Sharrows from Route 7 to the end of the Road
- Park Run Drive: Bike Lanes from Jones Branch Drive to Tysons Boulevard
- Westpark Drive: Climbing Lane from Galleria Drive to International Drive
7:00-8:30 PM. Mount Vernon District: Multiple streets and bicycle facilities. There are multiple proposals to improve the transportation environment for people who drive, bike, and walk in the Mount Vernnon District. The meeting is being held at the Mount Vernon Government Center, 2511 Parkers Lane, Alexandria, VA 22306. The following list represents the proposals that will be discussed:
- Fordson Road: Sharrows from Sherwood Hall Lane to Route 1
- Quander Road: Lane diet and bike lanes from Route 1 to Quander Elementary School
- Hinson Farm Road: Lane diet and bike lanes from Parkers Lane to Holland Road
- Parkers Lane/Collingwood Rd: Lane diet and bike lanes from Sherwood Hall Lane to Candlewood Drive
- Beacon Hill Road/Belle View Boulevard: Combination of bike lanes and sharrows from Route 1 to Fort Hunt Road
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mount Vernon District from Fairfax County
Mason District: Annanndale Road and Evergreen Lane. Each of these two projects proposes to reduce the existing travel lane width, and repurpose the extra space for bike lanes. No travel lanes will be removed. The meeting is being held at George Mason Regional Library 7001 Little River Turnpike, Annandale, VA 22003. The meeting scheduled fro 7:00 pm to 8:30 pm.
Project | Scope | Funding | Status |
---|---|---|---|
Various Locations within County | Purchase and install 150 inverted "U" bicycle racks and 30 bicycle lockers at locations throughout Fairfax County | C & I | On Going |
Project | Scope | Funding | Status |
---|---|---|---|
Burke VRE Connector Phase IV | Trail from VRE Station west to Oak Leather Court/Lake Barton | 2014 Bonds | Project Initiation |
CCT Pavement Upgrades | Upgrade and pave 7,900 LF of trail between Route 236 and Braddock Road | 2014 Bonds | Project Initiation |
Lake Braddock Drive Road Diet/Bike Lanes | On-road bike lanes from Burke Road to Rolling Road | 2014 Bonds | Project Initiation |
Wakefield Chapel Road Bike Lanes | Extend on-road bike lanes from Pulley Court to NVCC Campus | 2014 Bonds | Project Initiation |
Project | Scope | Funding | Status |
---|---|---|---|
Route 7 Shared Use Path | Path on both sides from Dulles Toll Road Bridge to Beulah Road | RSTP | Project Initiation |
McLean Wayfinding Signage | Add bicycle wayfinding signage in Downtown McLean | C & I | Complete |
River Bend Road-Beach Mill Road Bicycle Route | Add "Share the Road" and "Bike Route" signs on River Bend Road from Old Dominion Drive to Beach Mill Road and on Beach Mill Road from River Bend Road to the County Line | C & I | On Hold |
Scotts Run Walkway | Add 10’ Shared-Use path between Colshire Meadow Drive and Magarity Road through Scotts Run Community Park | RSTP | Project Initiation |
Project | Scope | Funding | Status |
---|---|---|---|
Old Courthouse Road Bike Shoulders (TMSAMS) | Both sides from Westbriar Drive northeast to Battery Park Street | RSTP | Project Rescoping |
Vesper Ct Trail | Trail from Vesper Court to Route 7 at Spring Hill Road | RSTP | Project Initiation |
Ashgrove Lane Trail | Trail along Ashgrove Lane from Irvin Street to Northern Neck Drive | RSTP | Project Initiation |
Wiehle Ave Station Walkway/Bikeway | Station entrance to Sunrise Valley Drive | RSTP | Project Initiation |
Wiehle Ave/ Washington & Old Dominion (W&OD) Trail Phase I | Trail Improvements | RSTP | Project Initiation |
Wiehle Ave/Washington & Old Dominion (W&OD) Trail Phase II | Construct pedestrian/bicycle grade separated crossing | RSTP | Project Initiation |
Wiehle Avenue Station | Construct secure bike & ride station as part of Wiehle/Reston Station | County Bonds | Construction |
Project | Scope | Funding | Status |
---|---|---|---|
Mason Neck Trail | Install 9,900 LF of 8-foot asphalt trail along Gunston Road from Pohick Bay Drive to the Pohick Bay Golf Course entrance | District Walkway | Land Acquisition |
Route 1 Trail | 340 LF of trail and new pedestrian bridge over Dogue Creek from Dogue Creek to Mobile Home Sales Park | Revenue Sharing, FTA | Project Initiation |
Project | Scope | Funding | Status |
---|---|---|---|
Idylwood Road Bike Facilities and Shared Use Path Improvements | Both sides from Helena Drive to Idyl Lane | RSTP | Project Initiation |
U.S. Route 29 Shared Use Path | Construct shared use path form Circle Towers Park to Vaden Drive | RSTP | Project Initiation |
Route 7 Shared Use Path | Path on both sides from Dulles Toll Road Bridge to Beulah Road | RSTP | Project Initiation |
Tysons Pavement Markings | Prepare Tysons area marking plan as identified in Bicycle Master Plan: Phase 1 Tysons Greater Area | RSTP | Project Initiation |
Tysons Wayfinding Signage | Design & Install bicycle route signage within the Tysons area | RSTP | Project Initiation |
GMU-Fairfax City-Vienna Metrorail Bike Route | Brand and sign bike route between GMU and Vienna Station | C & I | Project Initiation |
Project | Scope | Funding | Status |
---|---|---|---|
Burke Road Bike Lanes | On-road bike lanes/lane diet from Mill Cove Court to the Burke VRE Station | 2014 Bonds | Project Initiation |
Project | Scope | Funding | Status |
---|---|---|---|
Bobann Drive Bikeway | Construct 5000 LF of 10 ft wide asphalt trail from Wharton Lane to Stringfellow Road | C & I | Design |
Route 29 Trail | Missing segments from Stringfellow Road to Prince William County Line | Proffer | Project Initiation |
Route 50 Trail | Complete missing segments from West Ox Road to East of Lee Road | 2014 Bonds | Project Initiation |
West Ox Road Trail | Missing segments from Penderbrook Road to Route 50 | 2014 Bonds | Project Initiation |
Lees Corner Road Trail | Add 900 LF trail from Lee Jackson Highway to Bokel Drive along west side | C & I | Design |
Stringfellow Park & Ride | Install secure bicycle parking within park & ride building | 2014 Bonds | Design |