Transportation

CONTACT INFORMATION: Our office is open 8:00 AM-4:30 PM M-F
703-877-5600 TTY 711
4050 Legato Road, Suite 400
Fairfax, VA 22033
Gregg Steverson
Acting Director

Old Courthouse Road Realignment Project

Project Background

Old Courthouse Road Map November 2023The proposed improvements will realign Old Courthouse Road and raise the roadway to help improve safety and minimize roadway flooding. The project includes roadway reconstruction, new pedestrian/bicycle connection and replacing the substandard culvert with a new structure. The total project length is approximately 1,000 feet along Old Courthouse Road and 150 feet along Besley Road.

 

 

Image of Old Courthouse Road Current Conditions Anticipated Start Date: Jan 2, 2024  

Anticipated Completion Date: Nov. 2, 2025

Contractor: Fort Myer Construction Corporation

Construction Cost: $11,417,940.47

Plans and Models

Old Courthouse Road Model Bridge 1Plan information is now available for the Old Courthouse Road Realignment Project:

3D Renderings of the proposed bridge, shown right

Old Courthouse Road Model Bridge 2

Tentative Project Schedule

  • Land Acquisition - Spring 2022
  • Utility Relocation - Spring 2023
  • Permit - Summer 2022
  • Construction Advertisement - Spring 2023
  • Anticipated Start Date: Jan 2, 2024  
  • Anticipated Completion Date: Nov. 2, 2025

Estimated Project Cost And Funding

  • Engineering Design: $3.0 million
  • Right-of-Way/Utility Relocation: 1.1 million
  • Construction: $11,417,940.47 
  • Project Funding Source: 2014 Fairfax County Bonds

Updated April 19, 2022


Fairfax Virtual Assistant