Project Description
This project features 2,670 feet of sidewalk along the south side of Telegraph Road from 500 feet north of S. Kings Highway to Rose Hill Road/Lee District Park. The project widened the road and installed curb and gutter, storm drainage pipe and a retaining wall.
Construction began in October 2020 and was substantially completed in February 2022.
Contact Us
- Construction Issues: Ben Samiyimi, DPWES, 703-217-9786
- Transportation Questions: Bob Ayers, FCDOT, 703-877-5735, TTY 711
- Via U.S. mail: Fairfax County Department of Transportation, Attn: Telegraph Road Walkway Project, 4050 Legato Road, Suite 400, Fairfax, VA 22033.
FCDOT ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format or would like to request reasonable accommodations for persons with disabilities or limited English proficiency, contact FCDOT at 703-877-5600, TTY 711. Requests for assistance must be received at least 7 business days in advance of an event.