The Virginia Department of Transportation's (VDOT) Northern Virginia Paving Program improves hundreds of miles of roads in Fairfax County every year. VDOT and the Fairfax County Department of Transportation (FCDOT) use this program as an opportunity to increase safety for people who walk, bike, and drive with road and crosswalk improvements while minimizing the financial investment in restriping work.
Through the restriping program, FCDOT reviews VDOT's draft repaving list and searches for opportunities to add new active transportation improvements through striping modifications. These improvements typically include bike lanes, crosswalks, and road diets.
FCDOT staff will host virtual public information meetings to provide an overview of proposed restriping projects in each affected district. Please refer to the table below for upcoming district meetings, proposed locations and feedback instructions.
A recording of each meeting, along with any shared slides, will be uploaded to this webpage shortly after the meeting concludes. Residents will then have two weeks to submit comments and respond to a survey about each proposed project.
| Date | District | Proposals | View or Watch the Meeting | Comments |
Wednesday, Nov. 4 7 p.m. - 8:30 p.m. | Hunter Mill | Proposed bike lane improvements:
|
Join by phone
| Survey opens after the meeting. Comments due November 18 |
Thursday, Nov. 5 7 p.m. - 8:30 p.m. | Braddock District Mason District | Braddock District Proposed bike lane improvements:
Proposed crosswalk improvements:
Mason District Proposed crosswalk improvements:
|
Join by phone
| Survey opens after the meeting. Comments due November 19 |
Monday, Nov. 9 7 p.m. - 8:30 p.m. | Springfield District Mount Vernon District | Springfield District Proposed bike lane improvements:
Proposed crosswalk improvements:
Mount Vernon District Proposed bike lane improvements:
|
Join by phone
| Survey opens after the meeting. Comments due November 23 |
VDOT 2026 Statewide Status Paving Map
| Date | District | Proposals | Meeting Materials | Comments |
| Sept. 23, 2026 | Mount Vernon | Proposed bike lane improvements:
Proposed crosswalk improvements:
| Comment period has ended. | |
| Sept. 24, 2026 | Franconia |
| Comment period has ended. | |
| Oct. 7, 2026 | Hunter Mill Providence Dranesville | Hunter Mill
Providence
Dranesville
| Comment period has ended. | |
| Oct. 13, 2026 | Springfield | Proposed crosswalk improvements:
| Comment period has ended. |
| Date | District | Proposals | Meeting Materials | Comments |
| April 18, 2023 | Sully | Metrotech Drive | VDOT repaved in 2025 and included a road diet with bike lanes between Route 50 and Centreville Road. The bike lanes end prior to the signalized intersections to reduce traffic impacts. | |
| April 20, 2023 | Braddock / Mason | John Marr Drive | VDOT repaved John Marr Drive in 2025 to include an eastbound only bike lane on John Marr Drive between Backlick Road and the driveway of 4425 John Marr Drive. County staff are exploring a potential capital project to add a westbound bike lane and extend the bike lanes to Columbia Pike. | |
| Sept. 23, 2024 | Mason | Annandale Road Road Diet between Little River Turnpike and Gallows Road | VDOT approved a partial road diet from Galanis Drive to Medford Drive, which will be implemented during repaving. County staff are exploring a potential capital project for the segment between Medford Drive and Little River Turnpike. | |
| Oct. 9, 2024 | Mount Vernon | Huntington Avenue Reconfiguration between Richmond Highway and Telegraph Road | Nov. 2025: VDOT did not support a capital project to implement a road diet and bike lanes. Aug. 2025: VDOT did not approve a road diet on Huntington Avenue. County staff are exploring a potential capital project to implement the road diet and bike lanes. | |
| April 7, 2025 | Sully / Dranesville | Metrotech Drive Road Diet | ||
| April 8, 2025 | Hunter Mill / Providence / Braddock |
| ||
| April 9, 2025 | Mount Vernon | Paving Improvements | ||
| April 10, 2025 | Franconia | Proposed bike lanes on the following locations:
Crosswalk improvements at Kingstowne Commons Drive and Hollyford Lane - Approved | County staff reviewed the survey results and found a high number of responses from unusual locations. As such, County staff identified and removed results from beyond Franconia District to better reflect responses from the community. | |
| April 21, 2025 | Springfield / Mason | Piney Branch Road Road Diet and Crosswalk Improvements |
| The Piney Branch Road Road Diet was not implemented. |
| Date | District | Proposals | Meeting Materials | Comments |
| April 8, 2024 | Franconia / Mount Vernon | Franconia
Mount Vernon
| All Franconia and Mount Vernon proposals were approved. | |
| April 9, 2024 | Hunter Mill |
| The bike lanes proposal was approved; the crosswalk improvements proposal was not. | |
| April 10, 2024 | Providence |
| Both proposals were approved. | |
| April 11, 2024 | Braddock / Mason / Springfield | Braddock
Springfield
| The proposed bike lanes were not approved; all Braddock crosswalk improvement proposals were approved.
The proposed crosswalk improvements in Springfield District were not approved. | |
| April 23, 2024 | Sully / Dranesville | Sully
Dranesville
| The Sully bike lanes proposals were approved. The crosswalk improvements at Field Encampment Road and Cider Barrel Circle were approved. The crosswalk improvements at Compton Village Drive and Bradenton Drive were not approved The Dranesville proposal for crosswalk improvements was approved. |
Public Information Meetings; Submitting Feedback
Each year, the community is invited to provide striping-related feedback by attending a virtual public meeting and/or by submitting comments online. Meeting logistics and proposals will be posted by district as soon as they available. While meetings used to be held in the Spring prior to the Summer repaving season, meetings have more recently been scheduled to the fall of the previous calendar year to build in more time to the process.
The deadline for public comments will be two weeks after each district meeting is held.
Comments on proposed striping modifications (e.g., bike lanes, turn lanes, crosswalks, new on-street parking areas, new centerline markings and/or sight distance issues due to parked vehicles) can be submitted electronically to FCDOT; forms will be available with a list of proposed striping projects for all districts prior to every public meeting.
Road maintenance-related comments (e.g., drainage issues, missing signage, signal repair, walkway repair and sight distance issues due to vegetation overgrowth) should be submitted through the myVDOT portal: https://my.vdot.virginia.gov/. Unfortunately, no additional roads can be added to the preliminary paving schedule once it is released. If you would like to request road repairs, please follow the "I need a road repaired" link on the VDOT portal or call 1-800-FOR-ROAD (1-800-367-7623).
Information for Residents
- VDOT will begin repaving and restriping roadways in the spring and conclude in November. Exact work dates are available approximately ten days prior to work beginning, as contractors set schedules based on personnel and equipment availability.
- Residents can expect work vehicles in their neighborhood during the project.
- Motorists are asked to be alert to temporary traffic patterns. Cars, basketball hoops or garbage cans may need to be temporarily relocated while work is under way.
- On other roads such as interstates and some primaries, work may occur overnight.
Resources
For more information about bike infrastructure in Fairfax County, see the following resources: