Bathymetric Survey (BATH)

Bathymetric surveys measure the water depth and underwater features of a water impoundment. These surveys are required by Technical Bulletin 03-05 to evaluate the impacts of a proposed land disturbance on a downstream water body that lies within the “potential influence area“ of a proposed land disturbance and meets the criteria within the county Policy and Procedures for the Evaluation of Downstream Impoundments.
 

This information is the most common for how to obtain the necessary approval for your project and is not representative of all the conditions you may encounter.

 

WHO SHOULD APPLY?

Property owners or their duly authorized agents may submit bathymetric surveys, however, the survey itself must be prepared and certified by a professional engineer, land surveyor, architect or landscape architect licensed by the Commonwealth of Virginia and meeting the respective code requirements.

 

PLAN AHEAD

Before submitting, ensure you are aware of all applicable regulations and conditions that could affect your project to avoid surprises during the review process. Some of those factors include:

  • Zoning Information
  • Design Codes and Standards
  • Do I Need to Hire a Design Professional?
  • Floodplains
  • Resource Protection Areas (RPA)
  • Grading/Site Plans
  • Parking Tabulation
  • Types of Soils and Problem Soils
  • Researching Site Conditions

To get a detailed description about each regulation and condition, visit our Plan Ahead page.

 

HOW DO I SUBMIT MY RECORD?


PLUS Application

Apply for your bathymetric survey online in PLUS under the Site tab. If you are a first-time user, you must first register for an account.

Bathymetric survey application tab

 

Submission Guidelines

Visit our Site-Related Submission Guidelines page for information on how to submit your plan, including strongly encouraged naming conventions.

 

Tutorial on Uploading Plans and Documents in PLUS

Helpful Instruction Guide:

 

 

Requirements

Depending on the scope of your project, one or more of the following may be required:
 

First Submissions:

 

Subsequent Submissions:

  • Digital signature - verifiable digital signature of the licensed design professional
  • Applicant responses - enter responses to all open issues in the PLUS Digital Plan Room
  • Review fee

Helpful Videos:

red arrow in gray box Reviewing Issues, Conditions, & Notes in PLUS - YouTube

red arrow in gray box Upload Corrected Plans in PLUS - YouTube

Helpful Instruction Guides:

 

What's Next?

To get a step-by-step guide on PLUS statuses and what they mean, see our What is My PLUS Status? Site Plans Infographic.

 

Review Process

Staff from the Site Application Center and Site Development and Inspections Division will review your package for completeness and compliance with applicable codes and county ordinances. You will be notified of any deficiencies. Plan corrections, resubmission fees and additional supporting documents may be required.

For a detailed summary of application progress, to include the name(s) of assigned review staff, click on “Reports” in the top-right corner of the PLUS screen, when you are in a specific record, and select “Workflow Routing Slip Report.”

workflow routing slip

Plan Issuance

Once all reviews are approved and fees have been paid, your approved bathymetric survey will be available to download from PLUS.

Helpful Video:

red arrow in gray box Access Approved Plans in PLUS - YouTube Video

 

Additional Resources


 

Need More Assistance?

For questions or additional information, please visit the Site Application Center website or via telephone at 703-222-0801, TTY 711.


 

Back to Top

 

 

Was this guide helpful? Tell us by completing this feedback form.

Fairfax Virtual Assistant