Storage - High-Piled/Other

The Storage - High-Piled/Other record is required to support the following:

High-piled Lumber Yard/Agro-Industrial/Biomass Indoor
Other Installation of propane cylinder exchange station Modification to existing propane cylinder exchange station

 

This information is the most common for how to obtain the necessary approval for your project and is not representative of all the conditions you may encounter.

 

WHO SHOULD APPLY?

Property owners may obtain this plan approval in their own name.  No contractor is required.

 

PLAN AHEAD

Before submitting your plan, ensure you are aware of all applicable regulations and conditions that could affect your project, to avoid surprises during the review process. Factors that may apply for this permit include:

 

HOW DO I SUBMIT MY RECORD?

PLUS Application

Apply for your Storage - High-Piled/Other record online in PLUS under the Fire tab. If you are a first-time user, you must first register for an account.

application tab

 

Instructional Videos for PLUS

For step-by-step instructions to submit this record, click HERE.
  • Reference the parent or related building permit number if the proposed scope of work for the same project and address:
    • is relevant to a Building record
    • has plans submitted on another Fire record of same type
    • has a pending or approved Code Modification
 
 
 

 

 

Upon submission, the record number provided will start with FSTOR, then may be "masked" to include the review type being requested as outlined in the chart below.

High-piled - HP Installation or modification to propane cylinder exchange station - LP

 

Requirements

Document requirements will vary based on answers provided during the application process.

  • Plans - Required if the review type is High-piled, Lumber Yard/Agro-Industrial/Biomass, Indoor, or Other.
  • HPCS Fire Safety & Evacuation Plan - Required if review type is High piled.
  • Site Layout - Required if the review type is Installation of or modification to existing propane cylinder exchange station.
  • Temporary BPOL Certificate - Required if the licensed contractor does not have an active but required Business, Professional, and Occupational License (BPOL) with the Fairfax County Department of Tax Administration (DTA.).
  • Address List - Required if multiple addresses are to be reviewed under the scope of work.

First Submission

  • Provide Plans (aka Shop Drawings) that meet the necessary code requirements.
  • Projects located in the towns of Clifton, Herndon, or Vienna require separate approvals from the respective towns.

Subsequent Submissions

If corrections are required, you will receive an email with links and instructions to make corrections and resubmit.

  • Issues” are comments from reviewers, which require an applicant response before resubmitting. Please respond to each “open” comment.
  • Once complete, upload updated plans and/or documents, if needed, and complete your resubmission.

For further assistance, please refer to the below videos for step-by-step guidance on the resubmission process:

Helpful Videos:

red arrow in gray box Reviewing Issues, Conditions, & Notes in PLUS - YouTube

red arrow in gray box Void a Plan Sheet - YouTube

red arrow in gray box Upload Corrected Plans in PLUS - YouTube

 

What's Next?

To get a step-by-step guide on PLUS statuses and what they mean, see our What is My PLUS Status? infographic.

Below are the necessary steps to follow after your application is accepted in PLUS.

County Review

Staff in Revenue & Records and Engineering Plans Review will review your package for completeness and compliance with the fire code and county ordinances. You will be notified of any deficiencies. Plan corrections and additional supporting documents may be required.

Engineering Plans Review is responsible for verifying that designs submitted for installation comply with the Statewide Fire Prevention Code, Code of Fairfax County, and Public Facilities Manual. The Commercial Plan Review Submittal Requirements will explain what needs to be included in your plans/shop drawings.

 

Permit Issuance

Once the review is approved and fees have been paid, your permit card (if applicable) and approved plans will be available to download from PLUS. You will also receive a link via a PLUS email notification.

red arrow in gray box Access Approved Plans in PLUS - YouTube Video

 

Inspections

Once the permit is issued and you begin construction, you are required to obtain inspections from the county for your project. The county must be notified when the stages of construction are reached that require an inspection.

Requests for storage inspections can be made in PLUS.  Once scheduled by staff, a confirmation email will follow.

LP Exchange Station inspections can be scheduled in PLUS.

Additional Resources

 

Need More Assistance?

For questions or additional information, please contact staff:

Permit Application Process and Fees >> Call the Revenue & Records Branch at 703-246-4803, TTY 711 or email Fire.revenuepermits@fairfaxcounty.gov.

Plan Review >> Call the Engineering Plans Review Branch at 703-246-4806, TTY 711 or email Fire.engplansreview@fairfaxcounty.gov.

Storage Inspections >> Call the Special Projects Unit at 703-246-4660, TTY 711 or email Fire.inspections@fairfaxcounty.gov.

LP Exchange Station Inspections >> Call the Fire Prevention Inspections Section at 703-246-4849, TTY 711 or email Fire.inspections@fairfaxcounty.gov.

 

Back to Top

Fairfax Virtual Assistant